Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsSIC | 3251 | Brick And Structural Clay Tile |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0352 # 06 Y:2007 | 06 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $721 | $100 | Implemented |
NC0352 # 05 Y:2007 | 05 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,565 | $4,000 | Not Implemented |
NC0352 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $784 | $1,000 | Implemented |
NC0352 # 03 Y:2007 | 03 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,127 | $50 | Implemented |
NC0352 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,199 | $1,371 | Not Implemented |
NC0352 # 01 Y:2007 | 01 | 2007 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $28,336 | $8,000 | Implemented |
NC0314 # 05 Y:2005 | 05 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $7,252 | $2,552 | Implemented |
NC0314 # 01 Y:2005 | 01 | 2005 | INSULATE BARE EQUIPMENT | $8,544 | $1,824 | Implemented |
NC0314 # 02 Y:2005 | 02 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $848 | $1,393 | Implemented |
NC0314 # 03 Y:2005 | 03 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,259 | $379 | Implemented |
NC0314 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,022 | $100 | Implemented |
NC0314 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,356 | $660 | Implemented |
NC0314 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $435 | $367 | Not Implemented |
NC0127 # 03 Y:1997 | 03 | 1997 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,143 | $2,915 | Not Implemented |
NC0127 # 08 Y:1997 | 08 | 1997 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $11,985 | $2,850 | Not Implemented |
NC0127 # 07 Y:1997 | 07 | 1997 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $136,000 | $100,000 | Not Implemented |
NC0127 # 06 Y:1997 | 06 | 1997 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $109,730 | $100,000 | Not Implemented |
NC0127 # 05 Y:1997 | 05 | 1997 | REDESIGN PROCESS | $519 | $50 | Not Implemented |
NC0127 # 04 Y:1997 | 04 | 1997 | USE OPTIMUM THICKNESS INSULATION | $2,940 | $17,640 | Not Implemented |
NC0127 # 02 Y:1997 | 02 | 1997 | INSTALL OCCUPANCY SENSORS | $130 | $125 | Not Implemented |
NC0127 # 01 Y:1997 | 01 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,930 | $1,880 | Implemented |
NC0030 # 05 Y:1994 | 05 | 1994 | REDESIGN PROCESS | $2,768 | $782 | n/a |
NC0030 # 04 Y:1994 | 04 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,452 | $23,090 | n/a |
NC0030 # 03 Y:1994 | 03 | 1994 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $26,900 | $60,000 | n/a |
NC0030 # 02 Y:1994 | 02 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $16,871 | $27,600 | n/a |