IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
SIC 3251 Brick And Structural Clay Tile
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0352 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $721 $100 Implemented
NC0352 # 05 Y:2007 05 2007 RECOVER WASTE HEAT FROM EQUIPMENT $1,565 $4,000 Not Implemented
NC0352 # 01 Y:2007 01 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $28,336 $8,000 Implemented
NC0352 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,199 $1,371 Not Implemented
NC0352 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,127 $50 Implemented
NC0352 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $784 $1,000 Implemented
NC0314 # 05 Y:2005 05 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $7,252 $2,552 Implemented
NC0314 # 02 Y:2005 02 2005 DEVELOP A REPAIR/REPLACE POLICY $848 $1,393 Implemented
NC0314 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $8,544 $1,824 Implemented
NC0314 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,356 $660 Implemented
NC0314 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,022 $100 Implemented
NC0314 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,259 $379 Implemented
NC0314 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $435 $367 Not Implemented
NC0127 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,930 $1,880 Implemented
NC0127 # 02 Y:1997 02 1997 INSTALL OCCUPANCY SENSORS $130 $125 Not Implemented
NC0127 # 03 Y:1997 03 1997 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,143 $2,915 Not Implemented
NC0127 # 04 Y:1997 04 1997 USE OPTIMUM THICKNESS INSULATION $2,940 $17,640 Not Implemented
NC0127 # 05 Y:1997 05 1997 REDESIGN PROCESS $519 $50 Not Implemented
NC0127 # 06 Y:1997 06 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $109,730 $100,000 Not Implemented
NC0127 # 07 Y:1997 07 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $136,000 $100,000 Not Implemented
NC0127 # 08 Y:1997 08 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $11,985 $2,850 Not Implemented
NC0030 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,871 $27,600 n/a
NC0030 # 03 Y:1994 03 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $26,900 $60,000 n/a
NC0030 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,452 $23,090 n/a
NC0030 # 05 Y:1994 05 1994 REDESIGN PROCESS $2,768 $782 n/a