IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

78

matching recommendations
Reset
SIC 3261 Vitreous Plumbing Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW0022 # 01 Y:2008 01 2008 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $89,303 $52,321 Not Implemented
UW0022 # 08 Y:2008 08 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,849 $14,505 Not Implemented
UW0022 # 07 Y:2008 07 2008 INSULATE BARE EQUIPMENT $2,130 $1,260 Not Implemented
UW0022 # 02 Y:2008 02 2008 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $44,200 $27,200 Not Implemented
UW0022 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,233 $9,804 Not Implemented
UW0022 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,636 $4,640 Implemented
UW0022 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,172 $180 Implemented
UW0022 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,153 $0 Not Implemented
GT0747 # 07 Y:2003 07 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,662 $1,500 Implemented
GT0747 # 01 Y:2003 01 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $267 $100 Implemented
GT0747 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,776 $270,000 Not Implemented
GT0747 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $252 $350 Implemented
GT0747 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,740 $0 Implemented
GT0747 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $47,676 $9,250 Not Implemented
GT0747 # 06 Y:2003 06 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,358 $41,789 Implemented
GT0747 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $451 $135 Not Implemented
ND0332 # 01 Y:1999 01 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,688 $750 Not Implemented
ND0332 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,197 $7,544 Not Implemented
ND0332 # 03 Y:1999 03 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $117 $40 Implemented
ND0332 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $-61 $1,560 Not Implemented
ND0332 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,668 $500 Implemented
ND0332 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,580 $480 Implemented
ND0332 # 07 Y:1999 07 1999 RECOVER WASTE HEAT FROM EQUIPMENT $2,577 $1,200 Implemented
ND0332 # 08 Y:1999 08 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $721 $1,334 Not Implemented
KU0518 # 07 Y:1999 07 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $3,650 $10,000 Not Implemented