IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

40

matching recommendations
Reset
SIC 327 Concrete, Gypsum, And Plaster Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0893 # 10 Y:2013 10 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $974 $10,900 Implemented
UD0893 # 06 Y:2013 06 2013 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $1,159 $1,578 Implemented
UD0893 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $26 $0 Not Implemented
UD0893 # 07 Y:2013 07 2013 REPAIR OR REPLACE STEAM TRAPS $3,389 $9,600 Implemented
UD0893 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $350 $250 Not Implemented
UD0893 # 01 Y:2013 01 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $711 $0 Implemented
UD0893 # 08 Y:2013 08 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,001 $500 Not Implemented
UD0893 # 04 Y:2013 04 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,267 $4,330 Not Implemented
UD0893 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $184 $0 Implemented
UD0893 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,862 $19,001 Not Implemented
UD0577 # 03 Y:1999 03 1999 $118,825 $15,000 Not Implemented
UD0577 # 02 Y:1999 02 1999 $320,742 $525,000 Not Implemented
UD0577 # 01 Y:1999 01 1999 $640,050 $1,000,000 Not Implemented
UD0577 # 04 Y:1999 04 1999 RECOVER AND REUSE WASTE MATERIAL $88,813 $200,000 Not Implemented
UD0577 # 05 Y:1999 05 1999 $35,600 $57,000 Not Implemented
UD0577 # 06 Y:1999 06 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,171 $2,655 Not Implemented
UD0574 # 05 Y:1999 05 1999 REDUCE OR ELIMINATE WASTE $6,643 $10,000 Not Implemented
UD0574 # 04 Y:1999 04 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,572 $0 Implemented
UD0574 # 03 Y:1999 03 1999 USE A DIFFERENT OR RECYCLED RAW MATERIAL $11,550 $0 Not Implemented
UD0574 # 02 Y:1999 02 1999 $44,950 $110,000 Not Implemented
UD0574 # 01 Y:1999 01 1999 $53,280 $5,000 Not Implemented
UD0546 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,450 $6,900 Not Implemented
UD0546 # 04 Y:1998 04 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,403 $4,000 Implemented
UD0546 # 05 Y:1998 05 1998 REDUCE SCRAP PRODUCTION $1,933 $0 Not Implemented
UD0546 # 06 Y:1998 06 1998 RECOVER WASTE HEAT FROM EQUIPMENT $622 $600 Not Implemented