Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsSIC | 327 | Concrete, Gypsum, And Plaster Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0078 # 04 Y:2004 | 04 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,970 | $400 | Implemented |
UU0078 # 03 Y:2004 | 03 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,890 | $4,820 | Implemented |
UU0078 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,465 | $405 | Implemented |
UU0078 # 01 Y:2004 | 01 | 2004 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,850 | $10,000 | Not Implemented |
UU0078 # 07 Y:2004 | 07 | 2004 | OPTIMIZE PLANT POWER FACTOR | $10,400 | $11,590 | Not Implemented |
UU0078 # 08 Y:2004 | 08 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $810 | $450 | Implemented |
UU0078 # 06 Y:2004 | 06 | 2004 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $5,720 | $1,120 | Not Implemented |
UU0078 # 05 Y:2004 | 05 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,620 | $12,000 | Not Implemented |
TA0080 # 03 Y:2004 | 03 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $7,900 | $875 | Implemented |
TA0080 # 05 Y:2004 | 05 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,000 | $1,000 | Implemented |
TA0080 # 04 Y:2004 | 04 | 2004 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $3,990 | $1,600 | Implemented |
TA0080 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,160 | $585 | Implemented |
TA0080 # 01 Y:2004 | 01 | 2004 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $67,776 | $13,000 | Implemented |
UF0337 # 01 Y:2004 | 01 | 2004 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $309,508 | $180,000 | Not Implemented |
UF0337 # 02 Y:2004 | 02 | 2004 | DEVELOP A REPAIR/REPLACE POLICY | $1,095 | $68,454 | Not Implemented |
UF0337 # 03 Y:2004 | 03 | 2004 | ADD AREA LIGHTING SWITCHES | $9,552 | $13,873 | Not Implemented |
UF0337 # 04 Y:2004 | 04 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $11,459 | $0 | Not Implemented |
UF0337 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,725 | $385 | Not Implemented |
UF0337 # 06 Y:2004 | 06 | 2004 | OPTIMIZE PLANT POWER FACTOR | $3,477 | $12,000 | Not Implemented |
NC0278 # 01 Y:2004 | 01 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,343 | $18,000 | n/a |
NC0278 # 06 Y:2004 | 06 | 2004 | USE PHOTOCELL CONTROLS | $72 | $130 | Implemented |
NC0278 # 05 Y:2004 | 05 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $574 | $25 | Implemented |
NC0278 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,132 | $630 | Not Implemented |
NC0278 # 03 Y:2004 | 03 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $47 | $25 | Implemented |
NC0278 # 02 Y:2004 | 02 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $458 | $1,750 | Not Implemented |