IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

279

matching recommendations
Reset
SIC 3275 Gypsum Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0433 # 02 Y:2013 02 2013 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $19,439 $2,500 Implemented
UM0433 # 03 Y:2013 03 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $22,580 $1,000 Not Implemented
UM0433 # 04 Y:2013 04 2013 RECOVER WASTE HEAT FROM EQUIPMENT $37,193 $1,000 Implemented
OR0597 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,480 $9,480 Implemented
OR0597 # 02 Y:2012 02 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $41,834 $41,834 Not Implemented
OR0597 # 03 Y:2012 03 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,892 $11,892 Not Implemented
OR0597 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $3,853 $3,853 Implemented
UA0014 # 11 Y:2008 11 2008 INSTALL TIMERS AND/OR THERMOSTATS $1,430 $952 Implemented
UA0014 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,143 $1,040 Implemented
UA0014 # 03 Y:2008 03 2008 RECOVER WASTE HEAT FROM EQUIPMENT $2,493 $2,877 Not Implemented
UA0014 # 04 Y:2008 04 2008 OPTIMIZE PLANT POWER FACTOR $5,800 $14,850 Not Implemented
UA0014 # 05 Y:2008 05 2008 INSTALL TIMERS AND/OR THERMOSTATS $1,454 $591 Implemented
UA0014 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,934 $13,520 Not Implemented
UA0014 # 10 Y:2008 10 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $644 $700 Not Implemented
UA0014 # 09 Y:2008 09 2008 INSTALL OCCUPANCY SENSORS $2,288 $770 Not Implemented
UA0014 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,943 $1,164 Not Implemented
UA0014 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,796 $0 Implemented
UA0014 # 07 Y:2008 07 2008 SHUT OFF PILOTS IN STANDBY EQUIPMENT $457 $72 Implemented
CO0604 # 01 Y:2007 01 2007 IMPROVE COMBUSTION CONTROL CAPABILITY $140,220 $500,000 Not Implemented
CO0604 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,080 $68,340 Not Implemented
CO0604 # 03 Y:2007 03 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $27,400 $2,500 Implemented
CO0604 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,820 $310 Implemented
CO0604 # 02 Y:2007 02 2007 DIRECT WARMEST AIR TO COMBUSTION INTAKE $112,000 $18,430 Not Implemented
CO0603 # 02 Y:2007 02 2007 IMPROVE COMBUSTION CONTROL CAPABILITY $121,430 $100,000 Not Implemented
CO0603 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,160 $90 Not Implemented