Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
112
matching recommendationsSIC | 3291 | Abrasive Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0505 # 06 Y:2021 | 06 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $75 | $108 | Implemented |
SU0505 # 03 Y:2021 | 03 | 2021 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,333 | $79 | Implemented |
SU0505 # 01 Y:2021 | 01 | 2021 | DISCONNECT BALLASTS | $59 | $0 | Implemented |
SU0505 # 02 Y:2021 | 02 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $194 | $0 | Implemented |
NC0609 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,593 | $8,972 | Implemented |
NC0609 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $650 | $200 | Implemented |
NC0609 # 05 Y:2018 | 05 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,341 | $2,500 | Implemented |
NC0609 # 06 Y:2018 | 06 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $1,705 | $5,685 | Implemented |
TR0007 # 02 Y:2018 | 02 | 2018 | OPTIMIZE PLANT POWER FACTOR | $5,927 | $22,500 | Implemented |
TR0007 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $34,558 | $3,000 | Implemented |
TR0007 # 05 Y:2018 | 05 | 2018 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $5,572 | $500 | Implemented |
TR0007 # 08 Y:2018 | 08 | 2018 | INSULATE BARE EQUIPMENT | $421 | $38 | Implemented |
TR0007 # 06 Y:2018 | 06 | 2018 | INSTALL OCCUPANCY SENSORS | $4,304 | $6,855 | Implemented |
TR0007 # 03 Y:2018 | 03 | 2018 | RECYCLE FLUORESCENT LAMPS | $10,606 | $23,530 | Implemented |
TR0007 # 09 Y:2018 | 09 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $109 | $195 | Implemented |
UK1604 # 05 Y:2016 | 05 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,018 | $3,500 | Implemented |
UK1604 # 06 Y:2016 | 06 | 2016 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $2,304 | $3,620 | Implemented |
UK1604 # 08 Y:2016 | 08 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $56 | $61 | Implemented |
UK1604 # 07 Y:2016 | 07 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,094 | $5,000 | Implemented |
UK1604 # 01 Y:2016 | 01 | 2016 | OPTIMIZE PLANT POWER FACTOR | $14,750 | $8,715 | Implemented |
UK1604 # 04 Y:2016 | 04 | 2016 | INSTALL OCCUPANCY SENSORS | $153 | $280 | Implemented |
OK0927 # 02 Y:2015 | 02 | 2015 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $21,107 | $133,275 | Implemented |
OR0649 # 08 Y:2015 | 08 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,277 | $2,139 | Implemented |
OR0649 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,484 | $2,065 | Implemented |
OR0649 # 09 Y:2015 | 09 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,638 | $1,819 | Implemented |