Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
281
matching recommendationsSIC | 3295 | Minerals, Ground Or Treated |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0927 # 01 Y:2019 | 01 | 2019 | INSTALL OCCUPANCY SENSORS | $32,534 | $4,145 | Implemented |
GT0927 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,930 | $2,500 | Implemented |
GT0927 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $35,382 | $27,983 | Implemented |
GT0927 # 04 Y:2019 | 04 | 2019 | INSULATE BARE EQUIPMENT | $5,352 | $6,398 | Implemented |
GT0927 # 05 Y:2019 | 05 | 2019 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $308,141 | $1,725,000 | Not Implemented |
GT0927 # 06 Y:2019 | 06 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $62,369 | $548,847 | Not Implemented |
SU0463 # 05 Y:2018 | 05 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,314 | $8,600 | Not Implemented |
SU0463 # 06 Y:2018 | 06 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,345 | $14,020 | Not Implemented |
SU0463 # 04 Y:2018 | 04 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,966 | $4,800 | Implemented |
SU0463 # 01 Y:2018 | 01 | 2018 | INSTALL OCCUPANCY SENSORS | $3,799 | $2,040 | Not Implemented |
SU0463 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,444 | $22,334 | Not Implemented |
SU0463 # 03 Y:2018 | 03 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $29,334 | $68,970 | Not Implemented |
UU0134 # 01 Y:2018 | 01 | 2018 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $599,971 | $264,049 | Not Implemented |
UU0134 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,606 | $2,052 | Not Implemented |
UU0134 # 05 Y:2018 | 05 | 2018 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,549 | $0 | Implemented |
UU0134 # 03 Y:2018 | 03 | 2018 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $8,796 | $22,888 | Not Implemented |
UU0134 # 02 Y:2018 | 02 | 2018 | IMPROVE COMBUSTION CONTROL CAPABILITY | $19,372 | $15,000 | Not Implemented |
LE0435 # 01 Y:2017 | 01 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,125 | $20 | Implemented |
LE0435 # 03 Y:2017 | 03 | 2017 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,249 | $3,100 | Not Implemented |
LE0435 # 04 Y:2017 | 04 | 2017 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $18,948 | $76,000 | Not Implemented |
LE0435 # 05 Y:2017 | 05 | 2017 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,092 | $23,000 | Implemented |
LE0435 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,469 | $1,000 | Implemented |
NC0563 # 05 Y:2016 | 05 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $680 | $100 | Not Implemented |
NC0563 # 04 Y:2016 | 04 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,577 | $230 | Not Implemented |
NC0563 # 03 Y:2016 | 03 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $3,304 | $7,184 | Implemented |