IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

281

matching recommendations
Reset
SIC 3295 Minerals, Ground Or Treated
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0563 # 01 Y:2016 01 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,357 $3,050 Not Implemented
NC0563 # 02 Y:2016 02 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,026 $500 Not Implemented
NC0563 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $912 $2,450 Not Implemented
NC0563 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $680 $100 Not Implemented
NC0563 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $298 $200 Implemented
NC0563 # 09 Y:2016 09 2016 RECOVER WASTE HEAT FROM EQUIPMENT $212 $150 Not Implemented
NC0563 # 10 Y:2016 10 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $202 $250 Not Implemented
MA0696 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,810 $200 Implemented
MA0696 # 01 Y:2012 01 2012 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $19,393 $39,000 Implemented
MA0696 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,462 $6,035 Not Implemented
MA0696 # 04 Y:2012 04 2012 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,539 $17,500 Not Implemented
MA0696 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,048 $6,600 Implemented
MA0696 # 08 Y:2012 08 2012 INSTALL OCCUPANCY SENSORS $1,705 $4,080 Implemented
MA0696 # 09 Y:2012 09 2012 INSULATE BARE EQUIPMENT $622 $1,100 Not Implemented
MA0696 # 02 Y:2012 02 2012 REPAIR AND ELIMINATE STEAM LEAKS $15,781 $2,800 Implemented
MA0696 # 03 Y:2012 03 2012 USE OPTIMUM TEMPERATURE $6,647 $4,000 Not Implemented
UF0447 # 08 Y:2011 08 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,428 $19,015 Not Implemented
UF0447 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,292 $12,615 Not Implemented
UF0447 # 02 Y:2011 02 2011 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $455 $985 Not Implemented
UF0447 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,042 $0 Not Implemented
UF0447 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,286 $680 Not Implemented
UF0447 # 04 Y:2011 04 2011 USE PHOTOCELL CONTROLS $439 $147 Not Implemented
UF0447 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $125 $120 Not Implemented
UF0447 # 01 Y:2011 01 2011 INSULATE BARE EQUIPMENT $12,701 $6,982 Not Implemented
NC0410 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,826 $100 Not Implemented