IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsSIC | 3297 | Nonclay Refractories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0528 # 07 Y:2016 | 07 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,820 | $1,500 | Implemented |
WV0528 # 08 Y:2016 | 08 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $1,959 | $904 | Implemented |
WV0528 # 10 Y:2016 | 10 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $311 | $297 | Implemented |
WV0528 # 03 Y:2016 | 03 | 2016 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $10,032 | $1,000 | Implemented |
WV0528 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,004 | $325 | Implemented |
WV0528 # 09 Y:2016 | 09 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $635 | $3,000 | Implemented |
WV0528 # 02 Y:2016 | 02 | 2016 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $10,411 | $5,250 | Implemented |
UD0937 # 03 Y:2015 | 03 | 2015 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,253 | $0 | Implemented |
UD0937 # 10 Y:2015 | 10 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $948 | $0 | Implemented |
UD0937 # 09 Y:2015 | 09 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $330 | $1,911 | Implemented |
UD0937 # 05 Y:2015 | 05 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $114 | $150 | Implemented |
UD0937 # 01 Y:2015 | 01 | 2015 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $8,087 | $0 | Implemented |
UD0909 # 10 Y:2014 | 10 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $797 | $0 | Implemented |
UD0909 # 09 Y:2014 | 09 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $797 | $0 | Implemented |
UD0909 # 07 Y:2014 | 07 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,032 | $1,000 | Implemented |
UD0909 # 06 Y:2014 | 06 | 2014 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,214 | $5,000 | Implemented |
UD0909 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $667 | $2,940 | Implemented |
UD0909 # 02 Y:2014 | 02 | 2014 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,680 | $1,125 | Implemented |
UD0901 # 10 Y:2014 | 10 | 2014 | REDUCE VENTILATION AIR | $31,388 | $33,025 | Implemented |
UD0901 # 05 Y:2014 | 05 | 2014 | REDUCE FLUID FLOW RATES | $151,019 | $100,000 | Implemented |
UD0901 # 04 Y:2014 | 04 | 2014 | RECOVER AND REUSE COOLING WATER | $221,902 | $100,000 | Implemented |
WV0348 # 14 Y:2006 | 14 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,057 | $390 | Implemented |
WV0348 # 01 Y:2006 | 01 | 2006 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $22,813 | $25,350 | Implemented |
WV0348 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,642 | $8,678 | Implemented |
WV0348 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,260 | $0 | Implemented |