Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
197
matching recommendationsSIC | 3299 | Nonmetallic Mineral Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0213 # 06 Y:2001 | 06 | 2001 | INSULATE BARE EQUIPMENT | $9,104 | $17,000 | Not Implemented |
NC0213 # 07 Y:2001 | 07 | 2001 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $90,560 | $35,000 | Implemented |
SU0110 # 01 Y:2001 | 01 | 2001 | COMBINE UTILITY METERS | $5,085 | $0 | Not Implemented |
SU0110 # 02 Y:2001 | 02 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,180 | $2,241 | Not Implemented |
SU0110 # 03 Y:2001 | 03 | 2001 | MINIMIZE WATER USAGE | $51,680 | $1,605 | Not Implemented |
SU0110 # 04 Y:2001 | 04 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,023 | $90 | Not Implemented |
SU0110 # 05 Y:2001 | 05 | 2001 | DISCONNECT BALLASTS | $65 | $0 | Not Implemented |
SU0110 # 06 Y:2001 | 06 | 2001 | OPTIMIZE PLANT POWER FACTOR | $1,526 | $3,780 | Not Implemented |
KU0501 # 01 Y:1998 | 01 | 1998 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $19,090 | $33,780 | Not Implemented |
KU0501 # 02 Y:1998 | 02 | 1998 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $6,130 | $6,880 | Implemented |
KU0501 # 03 Y:1998 | 03 | 1998 | IMPROVE COMBUSTION CONTROL CAPABILITY | $2,960 | $10,890 | Not Implemented |
KU0501 # 04 Y:1998 | 04 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $670 | $440 | Implemented |
KU0501 # 05 Y:1998 | 05 | 1998 | USE SYNTHETIC LUBRICANT | $560 | $1,760 | Implemented |
KU0501 # 06 Y:1998 | 06 | 1998 | OPTIMIZE PLANT POWER FACTOR | $480 | $1,470 | Not Implemented |
KU0501 # 07 Y:1998 | 07 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $460 | $240 | Implemented |
KU0501 # 08 Y:1998 | 08 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $430 | $1,330 | Not Implemented |
KU0501 # 09 Y:1998 | 09 | 1998 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $6,550 | $20,000 | Not Implemented |
OK0515 # 01 Y:1997 | 01 | 1997 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $2,700 | $150 | Implemented |
OK0515 # 02 Y:1997 | 02 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $924 | $0 | Implemented |
OK0515 # 03 Y:1997 | 03 | 1997 | USE OTHER WASTE CONCENTRATION METHODS | $1,080 | $1,530 | Implemented |
OK0515 # 04 Y:1997 | 04 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,757 | $10,246 | Implemented |
OK0515 # 05 Y:1997 | 05 | 1997 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $26,000 | $0 | Implemented |
OK0515 # 06 Y:1997 | 06 | 1997 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $5,294 | $12,700 | Implemented |
OK0515 # 07 Y:1997 | 07 | 1997 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $6,825 | $50 | Not Implemented |
MA0359 # 01 Y:1996 | 01 | 1996 | INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS | $9,520 | $17,800 | Not Implemented |