IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,519

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0159 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,644 $3,000 Implemented
TT0159 # 07 Y:2015 07 2015 UPGRADE CONTROLS ON COMPRESSORS $2,995 $1,070 Implemented
TT0159 # 08 Y:2015 08 2015 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,187 $500 Implemented
MZ0187 # 02 Y:2015 02 2015 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $9,635 $6,500 Implemented
MZ0187 # 03 Y:2015 03 2015 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $684 $380 Implemented
MZ0187 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,096 $5,600 Implemented
MZ0187 # 05 Y:2015 05 2015 REPAIR AND ELIMINATE STEAM LEAKS $3,321 $1,440 Implemented
UA0144 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,060 $800 Implemented
UA0144 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,659 $2,995 Implemented
MA0748 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $1,687 $5,365 Implemented
MA0748 # 05 Y:2015 05 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $1,137 $100 Implemented
MA0748 # 06 Y:2015 06 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,168 $500 Implemented
MA0748 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $721 $2,245 Implemented
SF0468 # 01 Y:2015 01 2015 REPAIR AND ELIMINATE STEAM LEAKS $3,541 $0 Implemented
SF0468 # 03 Y:2015 03 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $13,761 $0 Implemented
SF0468 # 05 Y:2015 05 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,141 $1,658 Implemented
SF0468 # 06 Y:2015 06 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $26,031 $8,158 Implemented
SF0468 # 07 Y:2015 07 2015 INSULATE BARE EQUIPMENT $356 $274 Implemented
SF0468 # 08 Y:2015 08 2015 INSTALL OCCUPANCY SENSORS $2,043 $1,679 Implemented
SF0468 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,506 $8,348 Implemented
SF0468 # 10 Y:2015 10 2015 REPLACE BOILER $9,878 $51,914 Implemented
DL0146 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $6,880 $1,000 Implemented
DL0146 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $730 $100 Implemented
WV0506 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,853 $7,076 Implemented
WV0506 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,457 $7,450 Implemented