IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,519

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0454 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,236 $2,700 Implemented
SD0454 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $14,303 $13,546 Implemented
IA0480 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,512 $286 Implemented
IA0480 # 02 Y:2012 02 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,387 $5,172 Implemented
IA0480 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,272 $3,137 Implemented
IA0480 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,810 $1,912 Implemented
UM0402 # 01 Y:2012 01 2012 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $6,681 $200 Implemented
UM0402 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,300 $200 Implemented
UM0402 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,496 $2,000 Implemented
MZ0089 # 01 Y:2012 01 2012 INSTALL OCCUPANCY SENSORS $1,314 $1,810 Implemented
MZ0089 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,384 $8,860 Implemented
MZ0089 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,426 $1,160 Implemented
MZ0089 # 06 Y:2012 06 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $50,074 $11,000 Implemented
MZ0081 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,034 $860 Implemented
MZ0081 # 02 Y:2012 02 2012 INSULATE BARE EQUIPMENT $4,444 $4,000 Implemented
MZ0081 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $9,628 $8,667 Implemented
MZ0081 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $11,110 $9,100 Implemented
MZ0081 # 05 Y:2012 05 2012 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $58,850 $120,000 Implemented
MZ0081 # 06 Y:2012 06 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,137 $1,700 Implemented
MZ0081 # 07 Y:2012 07 2012 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $0 $0 Implemented
UMS006 # 03 Y:2012 03 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $28,000 $10,000 Implemented
AM0603 # 01 Y:2012 01 2012 USE RADIANT HEATER FOR SPOT HEATING $80,070 $66,160 Implemented
AM0603 # 02 Y:2012 02 2012 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $30,000 $2,320 Implemented
AM0603 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,750 $1,000 Implemented
AM0603 # 05 Y:2012 05 2012 USE PHOTOCELL CONTROLS $2,890 $260 Implemented