IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,364

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0448 # 10 Y:2011 10 2011 INSULATE BARE EQUIPMENT $5,708 $4,205 Not Implemented
UF0448 # 11 Y:2011 11 2011 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $291 $1,730 Not Implemented
UF0448 # 12 Y:2011 12 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $515,044 $294,885 Not Implemented
NC0439 # 01 Y:2011 01 2011 USE RADIANT HEATER FOR SPOT HEATING $37,298 $27,675 Not Implemented
NC0439 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,669 $39,646 Implemented
NC0439 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $330 $106 Implemented
NC0439 # 04 Y:2011 04 2011 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,390 $4,200 Implemented
NC0439 # 05 Y:2011 05 2011 DEVELOP A REPAIR/REPLACE POLICY $4,934 $2,393 Implemented
NC0439 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $1,486 $1,800 Not Implemented
NC0439 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,953 $100 Implemented
MA0678 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,383 $88,700 Implemented
MA0678 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,204 $5,760 Implemented
MA0678 # 03 Y:2011 03 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $9,343 $0 Implemented
MA0678 # 04 Y:2011 04 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $7,186 $0 Implemented
MA0678 # 05 Y:2011 05 2011 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,819 $26,495 Not Implemented
MA0678 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,833 $8,590 Not Implemented
WV0436 # 01 Y:2011 01 2011 PREHEAT COMBUSTION AIR WITH WASTE HEAT $62,911 $74,268 Not Implemented
WV0436 # 02 Y:2011 02 2011 OPTIMIZE PLANT POWER FACTOR $32,243 $22,700 Not Implemented
WV0436 # 03 Y:2011 03 2011 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $21,604 $29,900 Not Implemented
WV0436 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,837 $45,545 Implemented
WV0436 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,983 $8,375 Not Implemented
WV0436 # 06 Y:2011 06 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,039 $1,920 Not Implemented
WV0436 # 07 Y:2011 07 2011 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $7,082 $25,000 Not Implemented
WV0436 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,227 $12,576 Implemented
WV0436 # 09 Y:2011 09 2011 INSTALL TIMERS AND/OR THERMOSTATS $4,976 $5,400 Not Implemented