IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,344

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0296 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,069 $270 Not Implemented
TT0296 # 02 Y:2023 02 2023 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $66,640 $2,000 Not Implemented
TT0296 # 03 Y:2023 03 2023 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $200,000 $10,000 Not Implemented
TT0296 # 04 Y:2023 04 2023 UPGRADE CONTROLS ON COMPRESSORS $22,207 $1,640 Implemented
TT0296 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,264 $1,920 Implemented
TT0296 # 06 Y:2023 06 2023 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $81,000 $60,000 Implemented
TT0296 # 07 Y:2023 07 2023 OPTIMIZE PLANT POWER FACTOR $41,037 $32,500 Not Implemented
TT0296 # 08 Y:2023 08 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,078 $4,500 Not Implemented
TT0296 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,690 $8,100 Implemented
CW0128 # 01 Y:2023 01 2023 UPGRADE CONTROLS ON COMPRESSORS $5,763 $4,760 n/a
CW0128 # 02 Y:2023 02 2023 ADOPT IN-HOUSE MATERIAL GENERATION $215,269 $246,950 n/a
CW0128 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $956 $400 n/a
CW0128 # 04 Y:2023 04 2023 UPGRADE CONTROLS ON COMPRESSORS $2,001 $8,583 n/a
CW0128 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,453 $225 n/a
CW0128 # 06 Y:2023 06 2023 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $8,800 $26,211 n/a
GT0967 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $23,763 $800 Implemented
GT0967 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $48,377 $1,850 Implemented
GT0967 # 03 Y:2023 03 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,800 $1,000 Implemented
GT0967 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $968 $576 Implemented
GT0967 # 05 Y:2023 05 2023 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,843 $24,000 Not Implemented
GT0967 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $237,120 $2,593,008 Not Implemented
GT0967 # 07 Y:2023 07 2023 OPTIMIZE PLANT POWER FACTOR $2,881 $13,403 Not Implemented
UF0596 # 01 Y:2023 01 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $1,546,439 $3,990,000 Not Implemented
UF0596 # 02 Y:2023 02 2023 INSTALL SUB-METERING EQUIPMENT $266,539 $15,232 Implemented
UF0596 # 03 Y:2023 03 2023 DIRECT WARMEST AIR TO COMBUSTION INTAKE $232,670 $300,000 Implemented