IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

748

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0313 # 07 Y:2003 07 2003 RECOVER WASTE HEAT FROM EQUIPMENT $3,882 $15,000 Not Implemented
SD0313 # 08 Y:2003 08 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,800 $5,000 Not Implemented
SD0310 # 01 Y:2003 01 2003 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $374,073 $1,142,500 Not Implemented
SD0310 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,480 $14,000 Not Implemented
SD0310 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,693 $16,000 Not Implemented
SD0310 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $9,894 $3,000 Not Implemented
SD0310 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,878 $280 Implemented
SD0310 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,797 $0 Implemented
SD0310 # 07 Y:2003 07 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,916 $2,000 Not Implemented
SD0310 # 08 Y:2003 08 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,515 $4,000 Not Implemented
SD0310 # 09 Y:2003 09 2003 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,770 $0 Implemented
SD0310 # 10 Y:2003 10 2003 USE EVAPORATION TO CONCENTRATE MATERIAL $10,000 $15,000 Not Implemented
SD0310 # 11 Y:2003 11 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,800 $5,000 Not Implemented
LM0047 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,457 $6,432 Not Implemented
LM0047 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,703 $200 Implemented
LM0047 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $997 $228 Implemented
LM0047 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $370 $525 Implemented
LM0047 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $837 $1,365 Not Implemented
LM0047 # 06 Y:2003 06 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,158 $1,222 Not Implemented
LM0047 # 07 Y:2003 07 2003 DEVELOP STANDARD OPERATING PROCEDURES $250,000 $26,500 Implemented
LM0047 # 08 Y:2003 08 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $138,235 $2,000 Implemented
LM0047 # 09 Y:2003 09 2003 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $31,500 $2,000 Implemented
LM0047 # 10 Y:2003 10 2003 SCHEDULE DELIVERIES ACCORDING TO DEMAND $63,000 $5,000 Implemented
LM0045 # 01 Y:2002 01 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,878 $5,000 Not Implemented
LM0045 # 02 Y:2002 02 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,317 $1,000 Not Implemented