IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

930

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0318 # 06 Y:2005 06 2005 COVER OPEN TANKS $5,974 $12,120 Not Implemented
WV0318 # 07 Y:2005 07 2005 DEVELOP A REPAIR/REPLACE POLICY $4,198 $330 Implemented
WV0318 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,582 $11,537 Not Implemented
WV0318 # 09 Y:2005 09 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,258 $360 Implemented
WV0318 # 10 Y:2005 10 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,532 $5,220 Implemented
UD0711 # 01 Y:2005 01 2005 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER $343,339 $10,000 Not Implemented
UD0711 # 02 Y:2005 02 2005 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $143,601 $246,784 Not Implemented
UD0711 # 03 Y:2005 03 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $113,328 $400,000 Not Implemented
UD0711 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,341 $80,215 Not Implemented
UD0711 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,813 $2,025 Implemented
UD0711 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,651 $1,240 Implemented
UD0711 # 07 Y:2005 07 2005 UPGRADE CONTROLS ON COMPRESSORS $4,427 $600 Not Implemented
UD0711 # 08 Y:2005 08 2005 INSULATE BARE EQUIPMENT $1,305 $3,530 Implemented
UD0702 # 01 Y:2004 01 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $111,296 $120,000 Not Implemented
UD0702 # 02 Y:2004 02 2004 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $33,150 $13,800 Not Implemented
UD0702 # 03 Y:2004 03 2004 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $25,611 $10,795 Implemented
UD0702 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,166 $106,664 Not Implemented
UD0702 # 05 Y:2004 05 2004 MINIMIZE OVERFLOWS BY INSTALLING LEVEL CONTROLS $11,155 $11,025 Not Implemented
UD0702 # 06 Y:2004 06 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,969 $3,010 Not Implemented
UD0702 # 07 Y:2004 07 2004 UPGRADE CONTROLS ON COMPRESSORS $3,625 $0 Implemented
UD0702 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,961 $92 Implemented
UD0702 # 09 Y:2004 09 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,215 $600 Not Implemented
UD0702 # 10 Y:2004 10 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $892 $114 Implemented
UD0700 # 01 Y:2004 01 2004 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $454,279 $226,320 Not Implemented
UD0700 # 02 Y:2004 02 2004 INSTALL EQUIPMENT TO MOVE PRODUCT $256,000 $538,944 Not Implemented