Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
938
matching recommendationsSIC | 33 | Primary Metal Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0320 # 14 Y:2005 | 14 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $457 | $430 | Implemented |
WV0320 # 15 Y:2005 | 15 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $438 | $80 | Implemented |
WV0320 # 16 Y:2005 | 16 | 2005 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $351 | $26 | Not Implemented |
WV0318 # 01 Y:2005 | 01 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $39,332 | $8,388 | Implemented |
WV0318 # 02 Y:2005 | 02 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $21,012 | $3,064 | Implemented |
WV0318 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,845 | $6,470 | Implemented |
WV0318 # 04 Y:2005 | 04 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $12,757 | $620 | Implemented |
WV0318 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,670 | $587 | Implemented |
WV0318 # 06 Y:2005 | 06 | 2005 | COVER OPEN TANKS | $5,974 | $12,120 | Not Implemented |
WV0318 # 07 Y:2005 | 07 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $4,198 | $330 | Implemented |
WV0318 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,582 | $11,537 | Not Implemented |
WV0318 # 09 Y:2005 | 09 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,258 | $360 | Implemented |
WV0318 # 10 Y:2005 | 10 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,532 | $5,220 | Implemented |
UD0711 # 01 Y:2005 | 01 | 2005 | USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER | $343,339 | $10,000 | Not Implemented |
UD0711 # 02 Y:2005 | 02 | 2005 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $143,601 | $246,784 | Not Implemented |
UD0711 # 03 Y:2005 | 03 | 2005 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $113,328 | $400,000 | Not Implemented |
UD0711 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,341 | $80,215 | Not Implemented |
UD0711 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,813 | $2,025 | Implemented |
UD0711 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,651 | $1,240 | Implemented |
UD0711 # 07 Y:2005 | 07 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $4,427 | $600 | Not Implemented |
UD0711 # 08 Y:2005 | 08 | 2005 | INSULATE BARE EQUIPMENT | $1,305 | $3,530 | Implemented |
UD0702 # 01 Y:2004 | 01 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $111,296 | $120,000 | Not Implemented |
UD0702 # 02 Y:2004 | 02 | 2004 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $33,150 | $13,800 | Not Implemented |
UD0702 # 03 Y:2004 | 03 | 2004 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $25,611 | $10,795 | Implemented |
UD0702 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,166 | $106,664 | Not Implemented |