IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

208

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0400 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,673 $1,000 Implemented
LE0400 # 07 Y:2015 07 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,457 $3,025 Implemented
LE0400 # 04 Y:2015 04 2015 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $8,953 $1,920 Not Implemented
LE0400 # 09 Y:2015 09 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,334 $16,500 Implemented
LE0400 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,723 $28 Implemented
LE0362 # 05 Y:2013 05 2013 OPTIMIZE PLANT POWER FACTOR $86,433 $302,515 Not Implemented
LE0362 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $162,427 $899,500 Implemented
LE0362 # 03 Y:2013 03 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,545 $546 Implemented
LE0362 # 04 Y:2013 04 2013 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $41,942 $191,591 Not Implemented
LE0362 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $764 $1,373 Not Implemented
LE0362 # 08 Y:2013 08 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,088 $84,100 Not Implemented
LE0362 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,982 $12,000 Implemented
LE0362 # 06 Y:2013 06 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,176 $3,043 Not Implemented
LE0362 # 07 Y:2013 07 2013 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $114,240 $200,000 Implemented
DL0065 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,834 $2,409 Implemented
DL0065 # 01 Y:2011 01 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $14,500 $30,600 Not Implemented
DL0065 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,000 $22,400 Not Implemented
DL0065 # 03 Y:2011 03 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,460 $3,680 Not Implemented
DL0065 # 04 Y:2011 04 2011 DEVELOP A REPAIR/REPLACE POLICY $3,970 $1,158 Implemented
DL0065 # 05 Y:2011 05 2011 USE SOLAR HEAT TO MAKE ELECTRICTY $22,650 $328,687 Not Implemented
DL0065 # 07 Y:2011 07 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,530 $3,280 Not Implemented
DL0065 # 08 Y:2011 08 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $510 $50 Implemented
DL0044 # 06 Y:2009 06 2009 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $37,189 $70,000 Not Implemented
DL0044 # 05 Y:2009 05 2009 MODERATE COOLING TOWER OUTLET TEMPERATURE $6,452 $0 Not Implemented
DL0044 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $31,002 $5,550 Not Implemented