IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

582

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0222 # 10 Y:2000 10 2000 METER WASTE WATER $902 $0 Implemented
HO0211 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,520 $15,297 Implemented
HO0211 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,114 $9,233 Implemented
HO0211 # 03 Y:1999 03 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,289 $1,500 Implemented
HO0211 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,364 $20 Implemented
HO0211 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $900 $2,000 Implemented
HO0211 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,539 $200 Implemented
HO0211 # 07 Y:1999 07 1999 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $969 $1,400 Not Implemented
HO0211 # 08 Y:1999 08 1999 USE COMPRESSOR AIR FILTERS $6,130 $150 Implemented
HO0211 # 09 Y:1999 09 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,690 $1,400 Not Implemented
HO0211 # 10 Y:1999 10 1999 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $15,600 $480 Implemented
HO0174 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,898 $20,287 Implemented
HO0174 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $875 $2,308 Not Implemented
HO0174 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,918 $1,500 Implemented
HO0174 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $4,561 $7,680 Not Implemented
HO0174 # 05 Y:1998 05 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $7,800 $8,000 Not Implemented
HO0174 # 06 Y:1998 06 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $24,960 $5,000 Not Implemented
HO0174 # 07 Y:1998 07 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $7,800 $0 Not Implemented
HO0174 # 08 Y:1998 08 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,300 $0 Implemented
HO0167 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,801 $37,734 Not Implemented
HO0167 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,615 $6,215 Not Implemented
HO0167 # 03 Y:1998 03 1998 USE RADIANT HEATER FOR SPOT HEATING $3,129 $6,600 Not Implemented
HO0167 # 04 Y:1998 04 1998 INSTALL OCCUPANCY SENSORS $2,275 $1,400 Not Implemented
HO0167 # 05 Y:1998 05 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $530 $0 Not Implemented
HO0167 # 06 Y:1998 06 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,269 $30 Not Implemented