IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

545

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0133 # 01 Y:1991 01 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,600 $12,670 Not Implemented
AM0133 # 02 Y:1991 02 1991 RECOVER WASTE HEAT FROM EQUIPMENT $1,770 $845 Not Implemented
AM0133 # 03 Y:1991 03 1991 USE DEMAND CONTROLLER OR LOAD SHEDDER $750 $627 Not Implemented
AM0133 # 04 Y:1991 04 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $690 $300 Not Implemented
AM0133 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $120 $0 Not Implemented
AM0133 # 06 Y:1991 06 1991 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $245 $635 Not Implemented
AM0113 # 01 Y:1991 01 1991 USE UTILITY CONTROLLED POWER MANAGEMENT $687,000 $250,000 Implemented
AM0113 # 02 Y:1991 02 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $34,390 $88,900 Implemented
AM0113 # 03 Y:1991 03 1991 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,300 $280 Implemented
AM0113 # 04 Y:1991 04 1991 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $2,815 $400 Implemented
AM0113 # 05 Y:1991 05 1991 INSULATE BARE EQUIPMENT $340 $290 Implemented
AM0053 # 01 Y:1989 01 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,987 $6,125 Not Implemented
AM0053 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,275 $5,730 Implemented
AM0053 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48 $11 Implemented
AM0053 # 04 Y:1989 04 1989 INSTALL SET-BACK TIMERS $250 $50 Implemented
AM0053 # 05 Y:1989 05 1989 INSTALL SET-BACK TIMERS $205 $0 Not Implemented
AM0053 # 06 Y:1989 06 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $115 $300 Implemented
AM0044 # 01 Y:1988 01 1988 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $119,040 $0 Implemented
AM0044 # 02 Y:1988 02 1988 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $37,888 $68,580 Not Implemented
AM0044 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,283 $16,500 Not Implemented
AM0044 # 04 Y:1988 04 1988 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,950 $13,000 Not Implemented
AM0044 # 05 Y:1988 05 1988 REDESIGN PROCESS $3,863 $2,147 Implemented
AM0044 # 06 Y:1988 06 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,782 $3,782 Not Implemented
AM0044 # 07 Y:1988 07 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,500 $1,100 Implemented
AM0044 # 08 Y:1988 08 1988 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,152 $1,857 Not Implemented