IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,364

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0218 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,754 $11,785 Implemented
SF0218 # 08 Y:2001 08 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,572 $6,779 Not Implemented
SF0218 # 09 Y:2001 09 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $565 $2,735 Not Implemented
SF0218 # 10 Y:2001 10 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,579 $15,374 Not Implemented
AS0297 # 01 Y:2001 01 2001 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $166,920 $35,000 n/a
AS0297 # 02 Y:2001 02 2001 INSTALL SKYLIGHTS $1,527 $3,086 Not Implemented
AS0297 # 03 Y:2001 03 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $520 $240 Not Implemented
AS0297 # 04 Y:2001 04 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $25,657 $90,000 n/a
AS0297 # 05 Y:2001 05 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $3,360 $60 Not Implemented
AS0297 # 06 Y:2001 06 2001 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $5,712 $5,916 Not Implemented
SD0278 # 01 Y:2001 01 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $87,448 $164,000 Not Implemented
SD0278 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,045 $640 Not Implemented
SD0278 # 03 Y:2001 03 2001 INSTALL SKYLIGHTS $37,045 $37,000 Not Implemented
SD0278 # 04 Y:2001 04 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $802 $2,200 Not Implemented
SD0278 # 05 Y:2001 05 2001 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $21,960 $30,000 Not Implemented
SD0278 # 06 Y:2001 06 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,178 $2,300 Not Implemented
SD0278 # 07 Y:2001 07 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,754 $8,000 Not Implemented
SD0278 # 08 Y:2001 08 2001 AUTOMATE FINISHING PROCESS $100,600 $120,000 Not Implemented
SD0278 # 09 Y:2001 09 2001 INSTALL AUTOMATIC PACKING EQUIPMENT $113,800 $80,000 Not Implemented
UM0185 # 05 Y:2001 05 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $50,525 $10,000 Implemented
UM0185 # 06 Y:2001 06 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $126,200 $115,000 Not Implemented
UM0185 # 07 Y:2001 07 2001 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $28,800 $30,000 Not Implemented
UM0185 # 01 Y:2001 01 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,400 $600 Implemented
UM0185 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,546 $450 Implemented
UM0185 # 03 Y:2001 03 2001 OPTIMIZE PLANT POWER FACTOR $4,605 $24,000 Not Implemented