IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,364

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0127 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,907 $5,428 Not Implemented
UM0127 # 02 Y:1999 02 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $16,282 $250 Not Implemented
UM0127 # 03 Y:1999 03 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,496 $5,000 Not Implemented
UM0127 # 04 Y:1999 04 1999 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $30,552 $35,000 Not Implemented
UM0127 # 05 Y:1999 05 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $12,705 $13,600 Not Implemented
UL0207 # 01 Y:1998 01 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,709 $120 Implemented
UL0207 # 02 Y:1998 02 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,492 $20 Implemented
UL0207 # 03 Y:1998 03 1998 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $74,500 $163,800 Not Implemented
UL0207 # 04 Y:1998 04 1998 REUSE / RECYCLE/ SELL PAPER PRODUCTS $6,000 $1,320 Not Implemented
UL0207 # 05 Y:1998 05 1998 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $306,800 $117,500 Implemented
OR0331 # 01 Y:1998 01 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,374,400 $105,000 Implemented
OR0331 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,781 $1,000 Implemented
OR0331 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $78,861 $26,602 Not Implemented
OR0331 # 04 Y:1998 04 1998 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $14,990 $79,750 Not Implemented
OR0331 # 05 Y:1998 05 1998 OPTIMIZE PLANT POWER FACTOR $0 $136,000 Not Implemented
MS0120 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,885 $881 Implemented
MS0120 # 02 Y:1998 02 1998 RECOVER WASTE HEAT FROM EQUIPMENT $12,972 $5,703 Implemented
MS0120 # 03 Y:1998 03 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,002 $5,805 Not Implemented
MS0120 # 04 Y:1998 04 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,888 $6,000 Not Implemented
MS0120 # 05 Y:1998 05 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,417 $1,000 Implemented
MS0120 # 06 Y:1998 06 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,664 $270 Implemented
MS0120 # 07 Y:1998 07 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,987 $1,424 Implemented
MS0120 # 08 Y:1998 08 1998 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $15,436 $142,800 Not Implemented
MS0120 # 09 Y:1998 09 1998 OPERATE BOILERS ON HIGH FIRE SETTING $37,680 $0 Not Implemented
MS0120 # 10 Y:1998 10 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $171 $82 Not Implemented