IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

176

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0676 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $1,721 $2,750 Implemented
MA0676 # 03 Y:2011 03 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,019 $500 Not Implemented
MA0676 # 02 Y:2011 02 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $24,027 $4,000 Not Implemented
MA0676 # 01 Y:2011 01 2011 OPTIMIZE PLANT POWER FACTOR $204,367 $98,845 Implemented
MA0665 # 07 Y:2010 07 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $155 $180 Implemented
MA0665 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,028 $480 Implemented
MA0665 # 05 Y:2010 05 2010 INSTALL OCCUPANCY SENSORS $1,134 $3,150 Not Implemented
MA0665 # 04 Y:2010 04 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,470 $200 Implemented
MA0665 # 03 Y:2010 03 2010 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,625 $2,000 Not Implemented
MA0665 # 02 Y:2010 02 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,642 $18,330 Implemented
MA0665 # 01 Y:2010 01 2010 UPGRADE CONTROLS ON COMPRESSORS $15,680 $58,600 Implemented
MA0537 # 02 Y:2003 02 2003 ADOPT IN-HOUSE MATERIAL GENERATION $61,752 $240,000 Not Implemented
MA0537 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $94,545 $112,240 Not Implemented
MA0537 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,180 $8,000 Not Implemented
MA0537 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,446 $10,396 Implemented
MA0537 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $464 $150 Implemented
MA0537 # 05 Y:2003 05 2003 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $1,043 $3,500 Not Implemented
MA0537 # 07 Y:2003 07 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $154 $0 Implemented
MA0392 # 03 Y:1997 03 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,388 $6,000 Not Implemented
MA0392 # 01 Y:1997 01 1997 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $34,500 $21,950 Implemented
MA0392 # 02 Y:1997 02 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $8,500 $3,000 Not Implemented
MA0392 # 04 Y:1997 04 1997 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $320 $268 Implemented
MA0392 # 05 Y:1997 05 1997 CONVERT TO AQUEOUS CLEANING $276 $759 Implemented
MA0343 # 04 Y:1995 04 1995 ELIMINATE COMBUSTIBLE GAS IN FLUE GAS $2,131 $1,750 Not Implemented
MA0343 # 03 Y:1995 03 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,559 $3,300 Not Implemented