IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

930

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0564 # 05 Y:1999 05 1999 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $10,689 $0 Implemented
UD0564 # 06 Y:1999 06 1999 METER WASTE WATER $5,686 $2,200 Not Implemented
UD0564 # 07 Y:1999 07 1999 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,767 $3,375 Implemented
UD0564 # 08 Y:1999 08 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,156 $5,096 Not Implemented
UD0564 # 09 Y:1999 09 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $218 $684 Not Implemented
UD0563 # 01 Y:1999 01 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $29,762 $4,400 Not Implemented
UD0563 # 02 Y:1999 02 1999 ELIMINATE/REDUCE AN OPERATION $30,000 $6,648 Not Implemented
UD0563 # 03 Y:1999 03 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $26,365 $31,000 Implemented
UD0563 # 04 Y:1999 04 1999 USE DEMAND CONTROLLER OR LOAD SHEDDER $20,536 $3,000 Not Implemented
UD0563 # 05 Y:1999 05 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $17,707 $550 Not Implemented
UD0563 # 06 Y:1999 06 1999 USE SAND FOR OTHER PURPOSES (EG CONSTRUCTION FILL, COVER FOR MUNICIPAL LANDFILLS) $13,484 $2,645 Not Implemented
UD0563 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,212 $9,270 Implemented
UD0563 # 08 Y:1999 08 1999 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,880 $8,471 Not Implemented
UD0555 # 01 Y:1998 01 1998 EXPAND OPERATIONS INTO UNUSED SPACE $237,283 $1,313,000 Implemented
UD0555 # 02 Y:1998 02 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $123,160 $115,000 Not Implemented
UD0555 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $22,667 $20,000 Not Implemented
UD0555 # 04 Y:1998 04 1998 ELIMINATE/REDUCE AN OPERATION $17,490 $0 Implemented
UD0555 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,454 $0 Implemented
UD0555 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,882 $17,546 Implemented
UD0554 # 01 Y:1998 01 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $101,400 $60,000 Not Implemented
UD0554 # 02 Y:1998 02 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $47,736 $2,000 Not Implemented
UD0554 # 03 Y:1998 03 1998 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $28,560 $8,000 Implemented
UD0554 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $19,707 $21,120 Not Implemented
UD0554 # 05 Y:1998 05 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $4,026 $1,850 Implemented
UD0554 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,699 $6,419 Not Implemented