IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,313

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0111 # 08 Y:1997 08 1997 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $58,339 $56,250 Not Implemented
WV0111 # 09 Y:1997 09 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,033 $2,000 Implemented
WV0111 # 10 Y:1997 10 1997 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,079 $0 Implemented
WV0111 # 11 Y:1997 11 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $180 $0 Implemented
UD0511 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,757 $21,000 Implemented
UD0511 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $885 $4,700 Implemented
UD0511 # 03 Y:1997 03 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $28,000 $12,000 Implemented
UD0511 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,452 $20,000 Implemented
UD0511 # 05 Y:1997 05 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $52,379 $35,000 Implemented
UD0511 # 06 Y:1997 06 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $56,779 $70,000 Implemented
UD0511 # 07 Y:1997 07 1997 USE DEMAND CONTROLLER OR LOAD SHEDDER $23,300 $0 Not Implemented
UD0511 # 08 Y:1997 08 1997 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $9,802 $0 Implemented
UD0511 # 09 Y:1997 09 1997 OPTIMIZE PLANT POWER FACTOR $6,180 $5,000 Not Implemented
UD0511 # 10 Y:1997 10 1997 RECYCLE CASTING SAND $488,953 $900,000 Not Implemented
SD0162 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,580 $53,210 Implemented
SD0162 # 02 Y:1997 02 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $242,027 $70,000 Not Implemented
SD0162 # 03 Y:1997 03 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $198,103 $70,000 Not Implemented
SD0162 # 04 Y:1997 04 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $155,879 $298,500 Not Implemented
SD0162 # 05 Y:1997 05 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,408 $6,200 Implemented
SD0162 # 06 Y:1997 06 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,971 $2,200 Implemented
SD0162 # 07 Y:1997 07 1997 PREHEAT COMBUSTION AIR WITH WASTE HEAT $2,597 $3,500 Implemented
SD0162 # 08 Y:1997 08 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,744 $150 Implemented
SD0162 # 09 Y:1997 09 1997 INSTALL OCCUPANCY SENSORS $866 $1,394 Implemented
SD0162 # 10 Y:1997 10 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $33,421 $31,250 Implemented
SD0162 # 11 Y:1997 11 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $7,430 $500 Implemented