Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,364
matching recommendationsSIC | 33 | Primary Metal Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0069 # 03 Y:1996 | 03 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,360 | $7,226 | Not Implemented |
MS0069 # 04 Y:1996 | 04 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,012 | $925 | Not Implemented |
MS0069 # 05 Y:1996 | 05 | 1996 | USE POWER DURING OFF-PEAK PERIODS | $81,053 | $0 | Not Implemented |
MS0069 # 06 Y:1996 | 06 | 1996 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $10,080 | $640 | Not Implemented |
UM0060 # 01 Y:1996 | 01 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,500 | $1,607 | Implemented |
UM0060 # 02 Y:1996 | 02 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,561 | $12,818 | Not Implemented |
UM0060 # 03 Y:1996 | 03 | 1996 | OPTIMIZE PLANT POWER FACTOR | $2,418 | $6,182 | Not Implemented |
UM0060 # 04 Y:1996 | 04 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,807 | $2,550 | Implemented |
UM0060 # 05 Y:1996 | 05 | 1996 | TREAT AND REUSE RINSE WATERS | $1,039 | $1,000 | Implemented |
UM0064 # 01 Y:1996 | 01 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $557 | $400 | n/a |
UM0064 # 02 Y:1996 | 02 | 1996 | OPTIMIZE PLANT POWER FACTOR | $13,487 | $7,548 | n/a |
UM0064 # 03 Y:1996 | 03 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,967 | $4,130 | n/a |
UM0064 # 04 Y:1996 | 04 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,525 | $1,000 | n/a |
UM0064 # 05 Y:1996 | 05 | 1996 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $413 | $2,025 | n/a |
UM0064 # 06 Y:1996 | 06 | 1996 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $3,420 | $852 | n/a |
WI0281 # 01 Y:1996 | 01 | 1996 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $33,184 | $80,000 | Not Implemented |
WI0281 # 02 Y:1996 | 02 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $30,144 | $12,950 | Not Implemented |
WI0281 # 03 Y:1996 | 03 | 1996 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $19,250 | $0 | Not Implemented |
WI0281 # 04 Y:1996 | 04 | 1996 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $19,457 | $15,000 | Not Implemented |
WI0281 # 05 Y:1996 | 05 | 1996 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $11,051 | $26,220 | Not Implemented |
WI0281 # 06 Y:1996 | 06 | 1996 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $8,879 | $0 | Implemented |
WI0281 # 07 Y:1996 | 07 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,899 | $210 | Implemented |
WI0281 # 08 Y:1996 | 08 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $870 | $740 | Not Implemented |
WI0281 # 09 Y:1996 | 09 | 1996 | INSTALL AUTOMATIC STACK DAMPER | $931 | $1,100 | Not Implemented |
WI0281 # 10 Y:1996 | 10 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,554 | $701 | Implemented |