IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

930

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0515 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,688 $11,020 Not Implemented
UD0515 # 03 Y:1997 03 1997 CONSOLIDATE FREIGHT SHIPMENTS AND/OR DELIVERIES $34,031 $25,000 Not Implemented
UD0515 # 04 Y:1997 04 1997 MOVE PRODUCT USING MECHANICAL MEANS $67,125 $2,500 Not Implemented
UD0515 # 05 Y:1997 05 1997 MOVE PRODUCT USING MECHANICAL MEANS $19,500 $8,000 Not Implemented
UD0515 # 06 Y:1997 06 1997 USE OTHER METHODS FOR NEUTRALIZATION $5,655 $500 Not Implemented
UD0515 # 07 Y:1997 07 1997 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,789 $200 Implemented
UD0515 # 08 Y:1997 08 1997 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $1,875 $0 Not Implemented
UD0515 # 09 Y:1997 09 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $40,143 $150,000 Implemented
UD0511 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,757 $21,000 Implemented
UD0511 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $885 $4,700 Implemented
UD0511 # 03 Y:1997 03 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $28,000 $12,000 Implemented
UD0511 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,452 $20,000 Implemented
UD0511 # 05 Y:1997 05 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $52,379 $35,000 Implemented
UD0511 # 06 Y:1997 06 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $56,779 $70,000 Implemented
UD0511 # 07 Y:1997 07 1997 USE DEMAND CONTROLLER OR LOAD SHEDDER $23,300 $0 Not Implemented
UD0511 # 08 Y:1997 08 1997 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $9,802 $0 Implemented
UD0511 # 09 Y:1997 09 1997 OPTIMIZE PLANT POWER FACTOR $6,180 $5,000 Not Implemented
UD0511 # 10 Y:1997 10 1997 RECYCLE CASTING SAND $488,953 $900,000 Not Implemented
UD0489 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $2,203 $3,000 Not Implemented
UD0489 # 02 Y:1996 02 1996 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,117 $15,000 Implemented
UD0489 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,445 $10,800 Implemented
UD0489 # 04 Y:1996 04 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $488 $100 Implemented
UD0489 # 05 Y:1996 05 1996 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,008 $400 Not Implemented
UD0489 # 06 Y:1996 06 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,457 $1,000 Not Implemented
UD0487 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $1,502 $4,000 Not Implemented