IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

224

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0296 # 02 Y:2004 02 2004 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $22,518 $10,000 Not Implemented
NC0296 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $11,562 $2,000 Implemented
NC0296 # 04 Y:2004 04 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,604 $7,125 Not Implemented
NC0296 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,821 $100 Implemented
NC0296 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $241 $288 Implemented
NC0296 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $234 $660 Implemented
NC0296 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $79 $293 Not Implemented
NC0251 # 01 Y:2002 01 2002 INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES $29,079 $130,000 Not Implemented
NC0251 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $50,797 $100,000 Not Implemented
NC0251 # 03 Y:2002 03 2002 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $4,593 $7,000 Not Implemented
NC0251 # 04 Y:2002 04 2002 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $6,367 $10,000 Implemented
NC0251 # 05 Y:2002 05 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $4,768 $10,000 Implemented
NC0251 # 06 Y:2002 06 2002 INSULATE BARE EQUIPMENT $137 $574 Implemented
NC0241 # 01 Y:2002 01 2002 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $6,456 $8,000 Implemented
NC0241 # 02 Y:2002 02 2002 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,506 $6,000 Not Implemented
NC0241 # 03 Y:2002 03 2002 DEVELOP A REPAIR/REPLACE POLICY $4,751 $6,493 Implemented
NC0241 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $503 $576 Not Implemented
NC0241 # 05 Y:2002 05 2002 KEEP BOILER TUBES CLEAN $499 $1,600 Implemented
NC0140 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $489 $852 Implemented
NC0140 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $4,227 $1,090 Implemented
NC0140 # 03 Y:1998 03 1998 COVER OPEN TANKS $5,237 $10,500 Not Implemented
NC0140 # 04 Y:1998 04 1998 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,006 $6,000 Not Implemented
NC0140 # 05 Y:1998 05 1998 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $1,555 $200 Implemented
NC0140 # 06 Y:1998 06 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,915 $1,448 Not Implemented
NC0140 # 07 Y:1998 07 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $5,400 $200 Not Implemented