Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
930
matching recommendationsSIC | 33 | Primary Metal Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0948 # 08 Y:2016 | 08 | 2016 | OPTIMIZE PLANT POWER FACTOR | $11,880 | $60,000 | Not Implemented |
UD0948 # 09 Y:2016 | 09 | 2016 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $105,009 | $700 | Not Implemented |
UD0948 # 10 Y:2016 | 10 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,006 | $5,000 | Not Implemented |
UD0948 # 11 Y:2016 | 11 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $64,945 | $360,069 | Implemented |
UD0948 # 12 Y:2016 | 12 | 2016 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $195,456 | $17,000 | Not Implemented |
UD0946 # 01 Y:2016 | 01 | 2016 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $5,504 | $500 | Implemented |
UD0946 # 02 Y:2016 | 02 | 2016 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,148 | $1,660 | Not Implemented |
UD0946 # 03 Y:2016 | 03 | 2016 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $776 | $400 | Not Implemented |
UD0946 # 04 Y:2016 | 04 | 2016 | OPTIMIZE PLANT POWER FACTOR | $3,057 | $2,000 | Not Implemented |
UD0946 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $304 | $0 | Implemented |
UD0946 # 06 Y:2016 | 06 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,478 | $77,725 | Not Implemented |
UD0946 # 07 Y:2016 | 07 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $462 | $2,400 | Implemented |
UD0946 # 08 Y:2016 | 08 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $214 | $0 | Not Implemented |
WV0506 # 09 Y:2015 | 09 | 2015 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,221 | $1,000 | Implemented |
WV0506 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,708 | $22,650 | Not Implemented |
WV0506 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,853 | $7,076 | Implemented |
WV0506 # 03 Y:2015 | 03 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,907 | $0 | Not Implemented |
WV0506 # 04 Y:2015 | 04 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,073 | $3,560 | Not Implemented |
WV0506 # 05 Y:2015 | 05 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,457 | $7,450 | Implemented |
WV0506 # 06 Y:2015 | 06 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,757 | $5,570 | Not Implemented |
WV0506 # 07 Y:2015 | 07 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,579 | $270 | Implemented |
WV0506 # 08 Y:2015 | 08 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,372 | $351 | Not Implemented |
WV0506 # 10 Y:2015 | 10 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $790 | $1,205 | Implemented |
UM0454 # 05 Y:2015 | 05 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,354 | $1,000 | Not Implemented |
UM0454 # 04 Y:2015 | 04 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $13,892 | $4,500 | Not Implemented |