IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

260

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0364 # 03 Y:1996 03 1996 PREHEAT COMBUSTION AIR WITH WASTE HEAT $652 $12,000 Not Implemented
MA0364 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,606 $0 Not Implemented
MA0364 # 05 Y:1996 05 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,454 $900 Not Implemented
MA0364 # 06 Y:1996 06 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $755 $4,800 Not Implemented
MA0364 # 07 Y:1996 07 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $477 $1,100 Implemented
MA0364 # 08 Y:1996 08 1996 REDUCE VENTILATION AIR $360 $0 Not Implemented
MA0364 # 09 Y:1996 09 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $297 $0 Implemented
MA0364 # 10 Y:1996 10 1996 INSTALL OCCUPANCY SENSORS $171 $237 Not Implemented
MA0347 # 01 Y:1995 01 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,329 $20,441 Not Implemented
MA0347 # 02 Y:1995 02 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,019 $1,750 Not Implemented
MA0347 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,154 $8,175 Implemented
MA0347 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $364 $80 Not Implemented
MA0347 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $319 $900 Not Implemented
MA0347 # 06 Y:1995 06 1995 FILTER AND REUSE HYDRAULIC OIL $29,912 $51,750 Implemented
MA0347 # 07 Y:1995 07 1995 SHIP HYDRAULIC OIL TO SECONDARY FUEL PROGRAM $1,000 $0 Not Implemented
MA0322 # 01 Y:1995 01 1995 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $62,376 $150,000 Not Implemented
MA0322 # 02 Y:1995 02 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $20,120 $1,500 Implemented
MA0322 # 03 Y:1995 03 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,158 $2,200 Implemented
MA0322 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,082 $17,946 Implemented
MA0322 # 05 Y:1995 05 1995 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,750 $500 Not Implemented
MA0322 # 06 Y:1995 06 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $684 $578 Not Implemented
MA0322 # 07 Y:1995 07 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $384 $945 Implemented
MA0322 # 08 Y:1995 08 1995 USE OTHER WASTE CONCENTRATION METHODS $61,150 $85,000 Implemented
MA0322 # 09 Y:1995 09 1995 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE $28,494 $57,500 Not Implemented
MA0283 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,690 $435 Implemented