IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

384

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0071 # 10 Y:2011 10 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,736 $6,494 Implemented
MZ0070 # 01 Y:2011 01 2011 RECOVER WASTE HEAT FROM EQUIPMENT $1,076 $800 Implemented
MZ0070 # 02 Y:2011 02 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,693 $920 Implemented
MZ0070 # 03 Y:2011 03 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,071 $1,122 Implemented
MZ0070 # 04 Y:2011 04 2011 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,769 $360 Implemented
MZ0070 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $40,140 $10,000 Implemented
MZ0070 # 06 Y:2011 06 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $209 $200 Not Implemented
MZ0070 # 07 Y:2011 07 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $21,157 $16,730 Not Implemented
MZ0058 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,229 $41,660 Implemented
MZ0058 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,522 $22,400 Implemented
MZ0058 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $422,776 $140,000 Implemented
MZ0058 # 04 Y:2010 04 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $775 $360 Not Implemented
MZ0058 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,085 $1,300 Implemented
MZ0058 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,916 $0 Implemented
MZ0058 # 07 Y:2010 07 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,663 $0 Not Implemented
MZ0044 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,991 $38,600 Implemented
MZ0044 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,160 $5,600 Implemented
MZ0044 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $802 $460 Not Implemented
MZ0044 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,600 $850 Implemented
MZ0044 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,268 $0 Not Implemented
MZ0044 # 06 Y:2009 06 2009 RECOVER WASTE HEAT FROM EQUIPMENT $15,312 $10,000 Not Implemented
MZ0044 # 07 Y:2009 07 2009 RECOVER WASTE HEAT FROM EQUIPMENT $11,155 $10,000 Not Implemented
MZ0046 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $54,631 $54,630 Implemented
MZ0046 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,025 $14,100 Implemented
MZ0046 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $18,406 $1,380 Implemented