IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,353

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0052 # 05 Y:2014 05 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,689 $608 Not Implemented
WM0052 # 06 Y:2014 06 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,489 $9,750 Not Implemented
WM0052 # 07 Y:2014 07 2014 INSULATE BARE EQUIPMENT $2,595 $2,500 Not Implemented
WM0052 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $391 $375 Implemented
IA0524 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,605 $3,229 Implemented
IA0524 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,592 $197 Implemented
IA0524 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $620 $89 Implemented
IA0524 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $369 $1,010 Not Implemented
IA0524 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $297 $35 Implemented
IA0524 # 06 Y:2014 06 2014 USE OPTIMUM TEMPERATURE $660 $20 Implemented
IA0524 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $408 $110 Implemented
MA0734 # 01 Y:2014 01 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,242 $53,572 Not Implemented
MA0734 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,069 $15,975 Not Implemented
MA0734 # 03 Y:2014 03 2014 BURN A LESS EXPENSIVE GRADE OF FUEL $2,667 $2,565 Not Implemented
MA0734 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $2,594 $2,614 Not Implemented
MA0734 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $753 $2,210 Not Implemented
MA0734 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $338 $300 Implemented
UK1403 # 01 Y:2014 01 2014 OPTIMIZE PLANT POWER FACTOR $56,910 $52,500 Not Implemented
UK1403 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,517 $0 Not Implemented
UK1403 # 03 Y:2014 03 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,250 $0 Implemented
UK1403 # 04 Y:2014 04 2014 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $26,100 $0 Implemented
UK1403 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN WATER LINES AND VALVES $69,620 $7,000 Implemented
UK1403 # 06 Y:2014 06 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,405 $0 Not Implemented
UK1403 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $132,390 $479,700 Implemented
UK1403 # 08 Y:2014 08 2014 MINIMIZE WATER USAGE $68,700 $5,200 Not Implemented