Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,353
matching recommendationsSIC | 33 | Primary Metal Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0052 # 05 Y:2014 | 05 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,689 | $608 | Not Implemented |
WM0052 # 06 Y:2014 | 06 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,489 | $9,750 | Not Implemented |
WM0052 # 07 Y:2014 | 07 | 2014 | INSULATE BARE EQUIPMENT | $2,595 | $2,500 | Not Implemented |
WM0052 # 08 Y:2014 | 08 | 2014 | INSTALL OCCUPANCY SENSORS | $391 | $375 | Implemented |
IA0524 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,605 | $3,229 | Implemented |
IA0524 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,592 | $197 | Implemented |
IA0524 # 03 Y:2014 | 03 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $620 | $89 | Implemented |
IA0524 # 04 Y:2014 | 04 | 2014 | INSTALL OCCUPANCY SENSORS | $369 | $1,010 | Not Implemented |
IA0524 # 05 Y:2014 | 05 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $297 | $35 | Implemented |
IA0524 # 06 Y:2014 | 06 | 2014 | USE OPTIMUM TEMPERATURE | $660 | $20 | Implemented |
IA0524 # 07 Y:2014 | 07 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $408 | $110 | Implemented |
MA0734 # 01 Y:2014 | 01 | 2014 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $13,242 | $53,572 | Not Implemented |
MA0734 # 02 Y:2014 | 02 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,069 | $15,975 | Not Implemented |
MA0734 # 03 Y:2014 | 03 | 2014 | BURN A LESS EXPENSIVE GRADE OF FUEL | $2,667 | $2,565 | Not Implemented |
MA0734 # 04 Y:2014 | 04 | 2014 | INSULATE BARE EQUIPMENT | $2,594 | $2,614 | Not Implemented |
MA0734 # 05 Y:2014 | 05 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $753 | $2,210 | Not Implemented |
MA0734 # 06 Y:2014 | 06 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $338 | $300 | Implemented |
UK1403 # 01 Y:2014 | 01 | 2014 | OPTIMIZE PLANT POWER FACTOR | $56,910 | $52,500 | Not Implemented |
UK1403 # 02 Y:2014 | 02 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,517 | $0 | Not Implemented |
UK1403 # 03 Y:2014 | 03 | 2014 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,250 | $0 | Implemented |
UK1403 # 04 Y:2014 | 04 | 2014 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $26,100 | $0 | Implemented |
UK1403 # 05 Y:2014 | 05 | 2014 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $69,620 | $7,000 | Implemented |
UK1403 # 06 Y:2014 | 06 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,405 | $0 | Not Implemented |
UK1403 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $132,390 | $479,700 | Implemented |
UK1403 # 08 Y:2014 | 08 | 2014 | MINIMIZE WATER USAGE | $68,700 | $5,200 | Not Implemented |