IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,353

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0881 # 09 Y:2014 09 2014 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $267 $56 Implemented
OK0881 # 10 Y:2014 10 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $840 $910 Not Implemented
OK0881 # 11 Y:2014 11 2014 INSTALL TIMERS AND/OR THERMOSTATS $463 $181 Not Implemented
OK0881 # 12 Y:2014 12 2014 INSTALL SET-BACK TIMERS $6,977 $3,900 Not Implemented
OK0881 # 13 Y:2014 13 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,828 $18,850 Not Implemented
OK0881 # 14 Y:2014 14 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $381 $1,728 Not Implemented
OK0881 # 15 Y:2014 15 2014 INSTALL EQUIPMENT TO MOVE PRODUCT $88,525 $492,000 Implemented
BS0031 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $174 $977 Implemented
BS0031 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $300 $15 Implemented
BS0031 # 03 Y:2014 03 2014 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $3,665 $2,000 Not Implemented
BS0031 # 04 Y:2014 04 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,239 $650 Implemented
BS0031 # 05 Y:2014 05 2014 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $361 $467 Implemented
BS0031 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $242 $660 Implemented
UA0115 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,982 $22,285 Not Implemented
UA0115 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,820 $800 Implemented
UA0115 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,145 $2,595 Implemented
UA0115 # 04 Y:2014 04 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,420 $10,540 Not Implemented
UA0115 # 05 Y:2014 05 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,817 $23,475 Not Implemented
UA0115 # 06 Y:2014 06 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $3,192 $1,920 Implemented
UA0115 # 07 Y:2014 07 2014 REDUCE EXCESSIVE BOILER BLOWDOWN $5,071 $6,000 Not Implemented
AM0653 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,090 $47,700 Implemented
AM0653 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,460 $26 Implemented
AM0653 # 03 Y:2014 03 2014 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $14,200 $600 Not Implemented
AM0653 # 04 Y:2014 04 2014 USE SYNTHETIC LUBRICANT $12,640 $0 Not Implemented
AM0653 # 05 Y:2014 05 2014 USE RADIANT HEATER FOR SPOT HEATING $9,860 $7,200 Not Implemented