IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

241

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0141 # 07 Y:2002 07 2002 OPTIMIZE PLANT POWER FACTOR $17,677 $84,000 Not Implemented
SU0141 # 08 Y:2002 08 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,012 $480 Implemented
SU0141 # 09 Y:2002 09 2002 INSTALL OCCUPANCY SENSORS $2,155 $1,110 Implemented
SU0122 # 01 Y:2001 01 2001 USE WATER-BASED CUTTING FLUIDS TO ELIMINATE NEED FOR SOLVENT CLEANING $18,489 $0 Not Implemented
SU0122 # 02 Y:2001 02 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,468 $0 Not Implemented
SU0122 # 03 Y:2001 03 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $486 $0 Not Implemented
SU0122 # 04 Y:2001 04 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $15,879 $0 Not Implemented
SU0122 # 05 Y:2001 05 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $38 $0 Not Implemented
SU0117 # 01 Y:2001 01 2001 ELIMINATE/REDUCE AN OPERATION $7,264 $8,085 Not Implemented
SU0117 # 02 Y:2001 02 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $768 $0 Implemented
SU0117 # 03 Y:2001 03 2001 INSTALL AN UNINTERUPTABLE POWER SUPPLY $153,410 $531,678 Not Implemented
SU0117 # 04 Y:2001 04 2001 OPTIMIZE PLANT POWER FACTOR $12,307 $30,550 Not Implemented
SU0117 # 05 Y:2001 05 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,845 $158 Implemented
SU0117 # 06 Y:2001 06 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,016 $0 Not Implemented
SU0117 # 07 Y:2001 07 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,888 $20,600 Implemented
SU0113 # 01 Y:2001 01 2001 REDESIGN PROCESS $89,000 $44,000 Implemented
SU0113 # 02 Y:2001 02 2001 INCREASE USE OF AUTOMATION $76,400 $90,000 Not Implemented
SU0113 # 03 Y:2001 03 2001 RECOVER WASTE HEAT FROM EQUIPMENT $2,676 $705 Implemented
SU0113 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $890 $0 Implemented
SU0113 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $450 $0 Implemented
SU0113 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $319 $115 Implemented
SU0113 # 07 Y:2001 07 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $174 $60 Implemented
SU0101 # 01 Y:2001 01 2001 RECYCLE CASTING SAND $35,529 $45,000 Implemented
SU0101 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $370 $0 Implemented
SU0101 # 03 Y:2001 03 2001 AIR CONDITION ONLY SPACE NECESSARY $176 $253 Not Implemented