Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
241
matching recommendationsSIC | 33 | Primary Metal Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0141 # 07 Y:2002 | 07 | 2002 | OPTIMIZE PLANT POWER FACTOR | $17,677 | $84,000 | Not Implemented |
SU0141 # 08 Y:2002 | 08 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,012 | $480 | Implemented |
SU0141 # 09 Y:2002 | 09 | 2002 | INSTALL OCCUPANCY SENSORS | $2,155 | $1,110 | Implemented |
SU0122 # 01 Y:2001 | 01 | 2001 | USE WATER-BASED CUTTING FLUIDS TO ELIMINATE NEED FOR SOLVENT CLEANING | $18,489 | $0 | Not Implemented |
SU0122 # 02 Y:2001 | 02 | 2001 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,468 | $0 | Not Implemented |
SU0122 # 03 Y:2001 | 03 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $486 | $0 | Not Implemented |
SU0122 # 04 Y:2001 | 04 | 2001 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $15,879 | $0 | Not Implemented |
SU0122 # 05 Y:2001 | 05 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $38 | $0 | Not Implemented |
SU0117 # 01 Y:2001 | 01 | 2001 | ELIMINATE/REDUCE AN OPERATION | $7,264 | $8,085 | Not Implemented |
SU0117 # 02 Y:2001 | 02 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $768 | $0 | Implemented |
SU0117 # 03 Y:2001 | 03 | 2001 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $153,410 | $531,678 | Not Implemented |
SU0117 # 04 Y:2001 | 04 | 2001 | OPTIMIZE PLANT POWER FACTOR | $12,307 | $30,550 | Not Implemented |
SU0117 # 05 Y:2001 | 05 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,845 | $158 | Implemented |
SU0117 # 06 Y:2001 | 06 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,016 | $0 | Not Implemented |
SU0117 # 07 Y:2001 | 07 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,888 | $20,600 | Implemented |
SU0113 # 01 Y:2001 | 01 | 2001 | REDESIGN PROCESS | $89,000 | $44,000 | Implemented |
SU0113 # 02 Y:2001 | 02 | 2001 | INCREASE USE OF AUTOMATION | $76,400 | $90,000 | Not Implemented |
SU0113 # 03 Y:2001 | 03 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,676 | $705 | Implemented |
SU0113 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $890 | $0 | Implemented |
SU0113 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $450 | $0 | Implemented |
SU0113 # 06 Y:2001 | 06 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $319 | $115 | Implemented |
SU0113 # 07 Y:2001 | 07 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $174 | $60 | Implemented |
SU0101 # 01 Y:2001 | 01 | 2001 | RECYCLE CASTING SAND | $35,529 | $45,000 | Implemented |
SU0101 # 02 Y:2001 | 02 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $370 | $0 | Implemented |
SU0101 # 03 Y:2001 | 03 | 2001 | AIR CONDITION ONLY SPACE NECESSARY | $176 | $253 | Not Implemented |