IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

296

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0113 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $173,190 $46,250 Not Implemented
UU0113 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,620 $180 Not Implemented
UU0113 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,530 $20,000 Not Implemented
UU0113 # 04 Y:2006 04 2006 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $87,860 $500,000 Not Implemented
IC0123 # 04 Y:2006 04 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $861,835 $1,928,400 Not Implemented
IC0123 # 02 Y:2006 02 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $76,409 $252,000 Implemented
IC0123 # 03 Y:2006 03 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,509,727 $6,804,600 Not Implemented
IC0123 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $2,641,138 $12,550,416 Implemented
IC0123 # 05 Y:2006 05 2006 TREAT AND REUSE RINSE WATERS $92,357 $31,583 Not Implemented
TA0126 # 07 Y:2006 07 2006 USE SYNTHETIC LUBRICANT $455 $0 Not Implemented
TA0126 # 05 Y:2006 05 2006 REPAIR AND ELIMINATE STEAM LEAKS $2,600 $1,820 Implemented
TA0126 # 01 Y:2006 01 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $8,070 $3,858 Implemented
TA0126 # 06 Y:2006 06 2006 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,900 $685 Not Implemented
TA0126 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,660 $1,120 Implemented
TA0126 # 08 Y:2006 08 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $410 $0 Implemented
TA0126 # 04 Y:2006 04 2006 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,528 $0 Implemented
TA0126 # 03 Y:2006 03 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,950 $0 Implemented
OR0509 # 02 Y:2006 02 2006 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $58,000 $6,800 Implemented
OR0509 # 08 Y:2006 08 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,200 $3,000 Implemented
OR0509 # 07 Y:2006 07 2006 UPGRADE CONTROLS ON COMPRESSORS $7,000 $11,000 Implemented
OR0509 # 09 Y:2006 09 2006 ADOPT IN-HOUSE MATERIAL GENERATION $6,400 $22,000 Not Implemented
OR0509 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,900 $5,000 Implemented
OR0509 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,200 $2,250 Implemented
OR0509 # 05 Y:2006 05 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $1,300 $650 Not Implemented
OR0509 # 04 Y:2006 04 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $660 $240 Implemented