Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
141
matching recommendationsSIC | 33 | Primary Metal Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1811 # 07 Y:2018 | 07 | 2018 | INSTALL OCCUPANCY SENSORS | $2,332 | $4,270 | Implemented |
UK1811 # 06 Y:2018 | 06 | 2018 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $5,397 | $3,780 | Not Implemented |
UK1811 # 02 Y:2018 | 02 | 2018 | ELIMINATE/REDUCE AN OPERATION | $2,899 | $0 | Not Implemented |
UK1811 # 04 Y:2018 | 04 | 2018 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $372 | $0 | Not Implemented |
UK1811 # 05 Y:2018 | 05 | 2018 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $2,503 | $0 | Implemented |
UK1811 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,133 | $2,270 | Implemented |
UK1811 # 01 Y:2018 | 01 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,721 | $2,250 | Not Implemented |
UK1811 # 08 Y:2018 | 08 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $282 | $164 | Implemented |
UD0992 # 01 Y:2018 | 01 | 2018 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $14,245 | $700 | Implemented |
UD0992 # 05 Y:2018 | 05 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,174 | $9,900 | Not Implemented |
UD0992 # 04 Y:2018 | 04 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $11,815 | $0 | Not Implemented |
AM0763 # 01 Y:2018 | 01 | 2018 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $327,000 | $0 | Not Implemented |
UD0992 # 02 Y:2018 | 02 | 2018 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $48,158 | $1,000 | Not Implemented |
UD0992 # 03 Y:2018 | 03 | 2018 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $30,337 | $32,600 | Not Implemented |
AM0763 # 09 Y:2018 | 09 | 2018 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,640 | $7,720 | Implemented |
AM0763 # 08 Y:2018 | 08 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,600 | $37,900 | Implemented |
AM0763 # 07 Y:2018 | 07 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $38,500 | $400 | Not Implemented |
AM0763 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,730 | $42,230 | Implemented |
AM0763 # 05 Y:2018 | 05 | 2018 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $45,525 | $8,000 | Not Implemented |
AM0763 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $98,130 | $20,000 | Implemented |
AM0763 # 03 Y:2018 | 03 | 2018 | OPTIMIZE PLANT POWER FACTOR | $105,400 | $136,400 | Implemented |
AM0763 # 02 Y:2018 | 02 | 2018 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $515,700 | $2,200,000 | Not Implemented |
SU0466 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,439 | $44,602 | Implemented |
SU0466 # 05 Y:2018 | 05 | 2018 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $111 | $217 | Not Implemented |
SU0466 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $586 | $876 | Implemented |