Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
63
matching recommendationsSIC | 33 | Primary Metal Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0073 # 09 Y:1989 | 09 | 1989 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $236 | $0 | Implemented |
WI0073 # 07 Y:1989 | 07 | 1989 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $594 | $800 | Implemented |
WI0073 # 06 Y:1989 | 06 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $880 | $1,000 | Implemented |
WI0073 # 05 Y:1989 | 05 | 1989 | INSTALL SET-BACK TIMERS | $801 | $400 | Implemented |
WI0073 # 03 Y:1989 | 03 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,614 | $1,003 | Implemented |
WI0073 # 02 Y:1989 | 02 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $208 | $300 | Implemented |
TN0386 # 03 Y:1989 | 03 | 1989 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,664 | $0 | Implemented |
CO0163 # 06 Y:1989 | 06 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $340 | $130 | Implemented |
CO0163 # 05 Y:1989 | 05 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $570 | $400 | Implemented |
CO0163 # 02 Y:1989 | 02 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $480 | $600 | Implemented |
TN0386 # 07 Y:1989 | 07 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $659 | $500 | Implemented |
TN0386 # 04 Y:1989 | 04 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,407 | $3,860 | Implemented |
TN0386 # 01 Y:1989 | 01 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $17,995 | $9,500 | Implemented |
CO0163 # 03 Y:1989 | 03 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $900 | $500 | Implemented |
OR0058 # 02 Y:1989 | 02 | 1989 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,976 | $200 | Implemented |
OR0058 # 04 Y:1989 | 04 | 1989 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $1,914 | $200 | Implemented |
MA0154 # 02 Y:1989 | 02 | 1989 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $882 | $2,892 | Implemented |
OR0058 # 08 Y:1989 | 08 | 1989 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $847 | $1,170 | Implemented |
OR0058 # 07 Y:1989 | 07 | 1989 | COVER OPEN TANKS | $1,428 | $0 | Implemented |
OR0058 # 01 Y:1989 | 01 | 1989 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,281 | $0 | Implemented |
MA0154 # 01 Y:1989 | 01 | 1989 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,565 | $12,000 | Implemented |
TN0370 # 03 Y:1989 | 03 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,038 | $0 | Implemented |
TN0370 # 02 Y:1989 | 02 | 1989 | INSTALL TIMERS AND/OR THERMOSTATS | $6,433 | $560 | Implemented |
TN0367 # 04 Y:1989 | 04 | 1989 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,986 | $14,400 | Implemented |
TN0367 # 05 Y:1989 | 05 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,618 | $510 | Implemented |