Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
888
matching recommendationsSIC | 331 | Blast Furnace And Basic Steel Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0489 # 08 Y:2012 | 08 | 2012 | REDUCE VENTILATION AIR | $5,734 | $1,725 | Implemented |
SD0454 # 01 Y:2012 | 01 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,512 | $200 | Implemented |
SD0454 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,236 | $2,700 | Implemented |
SD0454 # 05 Y:2012 | 05 | 2012 | INSULATE BARE EQUIPMENT | $14,303 | $13,546 | Implemented |
WV0442 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,540 | $24,996 | Implemented |
WV0442 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,141 | $834 | Implemented |
WV0442 # 06 Y:2012 | 06 | 2012 | ADJUST BURNERS FOR EFFICIENT OPERATION | $3,725 | $10,260 | Implemented |
WV0442 # 08 Y:2012 | 08 | 2012 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,662 | $4,000 | Implemented |
WV0442 # 11 Y:2012 | 11 | 2012 | DEVELOP A REPAIR/REPLACE POLICY | $1,051 | $644 | Implemented |
WV0442 # 12 Y:2012 | 12 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $960 | $1,050 | Implemented |
LE0332 # 07 Y:2012 | 07 | 2012 | DEVELOP STANDARD OPERATING PROCEDURES | $6,689 | $0 | Implemented |
LE0332 # 08 Y:2012 | 08 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,829 | $40 | Implemented |
LE0331 # 04 Y:2012 | 04 | 2012 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $24,579 | $0 | Implemented |
LE0331 # 05 Y:2012 | 05 | 2012 | REDESIGN PROCESS | $20,100 | $0 | Implemented |
LE0331 # 07 Y:2012 | 07 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,134 | $2,500 | Implemented |
LE0331 # 08 Y:2012 | 08 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,005 | $1,000 | Implemented |
UA0072 # 01 Y:2012 | 01 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,176 | $2,039 | Implemented |
UA0072 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,742 | $3,900 | Implemented |
UA0072 # 03 Y:2012 | 03 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,647 | $80 | Implemented |
MA0676 # 01 Y:2011 | 01 | 2011 | OPTIMIZE PLANT POWER FACTOR | $204,367 | $98,845 | Implemented |
MA0676 # 04 Y:2011 | 04 | 2011 | INSULATE BARE EQUIPMENT | $1,721 | $2,750 | Implemented |
MA0676 # 05 Y:2011 | 05 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $593 | $1,250 | Implemented |
UA0064 # 01 Y:2011 | 01 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $35,684 | $5,000 | Implemented |
UA0064 # 03 Y:2011 | 03 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,660 | $800 | Implemented |
OK0813 # 02 Y:2011 | 02 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $52,531 | $65,527 | Implemented |