IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
SIC 331 Blast Furnace And Basic Steel Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0404 # 01 Y:2022 01 2022 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $176,387 $1,148,430 Not Implemented
MS0404 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $14,973 $3,790 Not Implemented
MS0404 # 02 Y:2022 02 2022 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $9,805 $22,420 Not Implemented
MS0404 # 03 Y:2022 03 2022 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $853 $525 Not Implemented
MS0350 # 02 Y:2010 02 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,024 $3,640 Implemented
MS0350 # 01 Y:2010 01 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,943 $1,610 Not Implemented
MS0350 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,808 $380 Implemented
MS0337 # 02 Y:2009 02 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $43,299 $6,450 Not Implemented
MS0337 # 01 Y:2009 01 2009 COVER OPEN TANKS $284,008 $8,869 Implemented
MS0337 # 04 Y:2009 04 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,045 $5,142 Not Implemented
MS0337 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,874 $4,735 Not Implemented
MS0337 # 03 Y:2009 03 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $38,691 $2,000 Not Implemented
MS0239 # 09 Y:2003 09 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $323 $742 Not Implemented
MS0239 # 08 Y:2003 08 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,703 $2,350 Not Implemented
MS0239 # 07 Y:2003 07 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,839 $1,000 Implemented
MS0239 # 10 Y:2003 10 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $317 $427 Not Implemented
MS0239 # 06 Y:2003 06 2003 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,948 $252 Not Implemented
MS0239 # 05 Y:2003 05 2003 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $2,265 $6,000 Implemented
MS0239 # 04 Y:2003 04 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,584 $15,350 Implemented
MS0239 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,196 $17,859 Implemented
MS0239 # 02 Y:2003 02 2003 BURN WASTE OIL FOR HEAT $26,706 $36,010 n/a
MS0239 # 01 Y:2003 01 2003 UPGRADE OBSOLETE EQUIPMENT $159,344 $600,000 Not Implemented
MS0239 # 11 Y:2003 11 2003 INSTALL TIMERS AND/OR THERMOSTATS $222 $119 Not Implemented
MS0147 # 06 Y:1999 06 1999 USE EVAPORATION TO CONCENTRATE MATERIAL $12,169 $24,480 Implemented
MS0147 # 05 Y:1999 05 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,027 $1,391 Not Implemented