IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,122

matching recommendations
Reset
SIC 331 Blast Furnace And Basic Steel Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0331 # 02 Y:2012 02 2012 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $42,903 $73,485 Not Implemented
LE0331 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,201 $136,500 Not Implemented
LE0331 # 04 Y:2012 04 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $24,579 $0 Implemented
LE0331 # 05 Y:2012 05 2012 REDESIGN PROCESS $20,100 $0 Implemented
LE0331 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,156 $12,800 Not Implemented
LE0331 # 07 Y:2012 07 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,134 $2,500 Implemented
LE0331 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,005 $1,000 Implemented
LE0331 # 09 Y:2012 09 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $805 $125 Not Implemented
UA0072 # 01 Y:2012 01 2012 RECOVER WASTE HEAT FROM EQUIPMENT $17,176 $2,039 Implemented
UA0072 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,742 $3,900 Implemented
UA0072 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,647 $80 Implemented
UA0072 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $6,856 $7,937 Not Implemented
UA0072 # 05 Y:2012 05 2012 USE PHOTOCELL CONTROLS $1,851 $1,030 Not Implemented
UA0072 # 06 Y:2012 06 2012 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $3,939 $9,445 Not Implemented
UA0072 # 07 Y:2012 07 2012 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,750 $415 Not Implemented
MA0676 # 01 Y:2011 01 2011 OPTIMIZE PLANT POWER FACTOR $204,367 $98,845 Implemented
MA0676 # 02 Y:2011 02 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $24,027 $4,000 Not Implemented
MA0676 # 03 Y:2011 03 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,019 $500 Not Implemented
MA0676 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $1,721 $2,750 Implemented
MA0676 # 05 Y:2011 05 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $593 $1,250 Implemented
UA0064 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $35,684 $5,000 Implemented
UA0064 # 02 Y:2011 02 2011 INSTALL COMMON HEADER ON COMPRESSORS $52,970 $54,000 Not Implemented
UA0064 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,660 $800 Implemented
UA0064 # 04 Y:2011 04 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $52,129 $12,420 Not Implemented
OK0813 # 01 Y:2011 01 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $116,318 $187,782 Not Implemented