IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

89

matching recommendations
Reset
SIC 331 Blast Furnace And Basic Steel Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1312 # 09 Y:2013 09 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $815 $0 Implemented
UK1312 # 10 Y:2013 10 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $109,909 $9,000 Implemented
UK1312 # 11 Y:2013 11 2013 INSTALL REPLACEMENT DOORS $49,300 $270,900 Not Implemented
UK1312 # 12 Y:2013 12 2013 ADJUST BURNERS FOR EFFICIENT OPERATION $5,094 $8,500 Not Implemented
UK1312 # 13 Y:2013 13 2013 INSULATE BARE EQUIPMENT $4,473 $3,055 Not Implemented
UL0238 # 03 Y:2000 03 2000 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $15,288 $80,000 Not Implemented
UL0238 # 02 Y:2000 02 2000 DISCONNECT BALLASTS $12,291 $1,236 Implemented
UL0238 # 01 Y:2000 01 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,743 $0 Not Implemented
UL0231 # 02 Y:1999 02 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $757 $0 Not Implemented
UL0231 # 04 Y:1999 04 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $36,750 $23,166 Not Implemented
UL0231 # 03 Y:1999 03 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $876 $0 Not Implemented
UL0231 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,275 $101 Not Implemented
UL0200 # 09 Y:1998 09 1998 ADD ADDITIONAL PRODUCTION SHIFT $21,000 $10,000 Not Implemented
UL0200 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,608 $6,654 Not Implemented
UL0200 # 02 Y:1998 02 1998 INSTALL TIMERS AND/OR THERMOSTATS $647 $400 Not Implemented
UL0200 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,112 $200 Not Implemented
UL0200 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $661 $1,128 Not Implemented
UL0200 # 05 Y:1998 05 1998 OPTIMIZE PLANT POWER FACTOR $8,870 $2,300 Not Implemented
UL0200 # 06 Y:1998 06 1998 USE BUILDING MATERIALS WHICH REQUIRE LESS ENERGY TO PRODUCE $45,190 $106,250 Not Implemented
UL0200 # 07 Y:1998 07 1998 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE $19,940 $90,000 Not Implemented
UL0200 # 08 Y:1998 08 1998 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $1,000,000 $102,500 Not Implemented
UL0154 # 07 Y:1996 07 1996 USE LESS WASTEFUL PACKAGING $26,750 $36,000 Not Implemented
UL0154 # 06 Y:1996 06 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,040 $500 Not Implemented
UL0154 # 05 Y:1996 05 1996 REDUCE OR ELIMINATE WASTE $7,500 $900 Not Implemented
UL0154 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $289 $35 Not Implemented