IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,122

matching recommendations
Reset
SIC 331 Blast Furnace And Basic Steel Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0187 # 07 Y:2000 07 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,569 $4,392 Implemented
SF0187 # 08 Y:2000 08 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $7,099 $32,250 Implemented
SF0187 # 09 Y:2000 09 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,849 $10,470 Implemented
SF0187 # 10 Y:2000 10 2000 RECOVER AND REUSE WASTE MATERIAL $1,085 $0 Implemented
SF0187 # 11 Y:2000 11 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,250 $150 Implemented
SF0187 # 12 Y:2000 12 2000 USE EVAPORATION TO CONCENTRATE MATERIAL $3,564 $5,500 Implemented
SF0187 # 13 Y:2000 13 2000 USE ALTERNATIVE FLOCCULENT TO MINIMIZE SLUDGE VOLUME $4,155 $19,400 Not Implemented
TN0681 # 01 Y:2000 01 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $32,683 $83,500 Implemented
TN0681 # 02 Y:2000 02 2000 MODIFY CURRENT INCENTIVE PROGRAM $20,000 $16,083 Implemented
TN0681 # 03 Y:2000 03 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $11,200 $23,000 Implemented
TN0681 # 04 Y:2000 04 2000 DISCONNECT BALLASTS $6,170 $250 Not Implemented
TN0681 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $3,865 $9,000 Not Implemented
TN0681 # 06 Y:2000 06 2000 COVER OPEN TANKS $2,400 $1,700 Not Implemented
OK0589 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,862 $1,900 Implemented
OK0589 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,093 $4,942 Implemented
OK0589 # 03 Y:2000 03 2000 USE PHOTOCELL CONTROLS $504 $136 Implemented
OK0589 # 04 Y:2000 04 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $72,000 $230,000 Implemented
OK0589 # 05 Y:2000 05 2000 RECOVER AND REUSE WASTE MATERIAL $20,274 $59,400 Implemented
UL0238 # 01 Y:2000 01 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,743 $0 Not Implemented
UL0238 # 02 Y:2000 02 2000 DISCONNECT BALLASTS $12,291 $1,236 Implemented
UL0238 # 03 Y:2000 03 2000 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $15,288 $80,000 Not Implemented
ND0341 # 01 Y:1999 01 1999 DEVELOP A REPAIR/REPLACE POLICY $22,377 $60,343 Not Implemented
ND0341 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $128 $200 Not Implemented
ND0341 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $344 $180 Implemented
ND0341 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3 $300 Not Implemented