IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
Reset
SIC 331 Blast Furnace And Basic Steel Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1014 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,926 $9,064 Implemented
OK1014 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,017 $1,750 Implemented
OK1014 # 02 Y:2019 02 2019 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $3,114 $3,878 Implemented
OK1013 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $60,608 $35,153 Implemented
OK1013 # 06 Y:2019 06 2019 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $4,999 $4,520 Implemented
OK1013 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,284 $4,982 Implemented
MZ0104 # 05 Y:2012 05 2012 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $3,111 $900 Implemented
MZ0104 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,616 $30,000 Implemented
MZ0104 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,398 $26,000 Implemented
MZ0104 # 10 Y:2012 10 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $83,490 $112,500 Implemented
LL0251 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $6,369 $9,300 Implemented
LL0251 # 08 Y:2006 08 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $634 $787 Implemented
LL0251 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $19,891 $2,392 Implemented
LL0192 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $41,577 $4,400 Implemented
LL0192 # 01 Y:2004 01 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $61,254 $2,590 Implemented
LL0192 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,708 $2,585 Implemented
AR0171 # 02 Y:1999 02 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $230 $0 Implemented
AR0171 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $21,142 $630 Implemented
AR0171 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,414 $800 Implemented
AR0146 # 03 Y:1998 03 1998 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $29,234 $18,900 Implemented
AR0146 # 04 Y:1998 04 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,398 $1,340 Implemented
AR0146 # 05 Y:1998 05 1998 REDUCE OR ELIMINATE WASTE $224,855 $8,100 Implemented
AR0146 # 07 Y:1998 07 1998 $3,780 $0 Implemented
AR0146 # 08 Y:1998 08 1998 $98,162 $386,400 Implemented
AR0146 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,850 $300 Implemented