IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
SIC 331 Blast Furnace And Basic Steel Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0141 # 09 Y:2002 09 2002 INSTALL OCCUPANCY SENSORS $2,155 $1,110 Implemented
SU0141 # 02 Y:2002 02 2002 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $640,000 $9,000,000 Implemented
SU0141 # 01 Y:2002 01 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,663,245 $4,336,000 Not Implemented
SU0141 # 03 Y:2002 03 2002 CONSOLIDATE FREIGHT SHIPMENTS AND/OR DELIVERIES $522,000 $4,077,000 Not Implemented
SU0141 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $117,834 $95,000 Implemented
SU0141 # 05 Y:2002 05 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $55,317 $203,719 Implemented
SU0141 # 07 Y:2002 07 2002 OPTIMIZE PLANT POWER FACTOR $17,677 $84,000 Not Implemented
SU0141 # 08 Y:2002 08 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,012 $480 Implemented
SU0141 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $33,774 $0 Not Implemented
NC0241 # 05 Y:2002 05 2002 KEEP BOILER TUBES CLEAN $499 $1,600 Implemented
NC0241 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $503 $576 Not Implemented
NC0241 # 03 Y:2002 03 2002 DEVELOP A REPAIR/REPLACE POLICY $4,751 $6,493 Implemented
NC0241 # 02 Y:2002 02 2002 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,506 $6,000 Not Implemented
NC0241 # 01 Y:2002 01 2002 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $6,456 $8,000 Implemented
GT0729 # 05 Y:2002 05 2002 UPGRADE CONTROLS ON COMPRESSORS $60 $70 Not Implemented
GT0729 # 02 Y:2002 02 2002 PREHEAT COMBUSTION AIR WITH WASTE HEAT $74,140 $270,000 n/a
GT0729 # 03 Y:2002 03 2002 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $71,787 $13,892 n/a
GT0729 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,990 $1,450 Not Implemented
GT0729 # 09 Y:2002 09 2002 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $235,152 $156,000 Not Implemented
GT0729 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,537 $10,872 Not Implemented
GT0729 # 07 Y:2002 07 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $693 $1,198 Not Implemented
GT0729 # 08 Y:2002 08 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,137 $162,293 Not Implemented
GT0729 # 01 Y:2002 01 2002 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $563,200 $312,500 Not Implemented
WI0421 # 02 Y:2002 02 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,154 $2,688 Not Implemented
WI0421 # 05 Y:2002 05 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,752 $8,000 Not Implemented