Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
81
matching recommendationsSIC | 331 | Blast Furnace And Basic Steel Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0113 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,620 | $180 | Not Implemented |
UU0113 # 04 Y:2006 | 04 | 2006 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $87,860 | $500,000 | Not Implemented |
UU0113 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $173,190 | $46,250 | Not Implemented |
UU0113 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $45,530 | $20,000 | Not Implemented |
IC0123 # 05 Y:2006 | 05 | 2006 | TREAT AND REUSE RINSE WATERS | $92,357 | $31,583 | Not Implemented |
IC0123 # 04 Y:2006 | 04 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $861,835 | $1,928,400 | Not Implemented |
IC0123 # 03 Y:2006 | 03 | 2006 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,509,727 | $6,804,600 | Not Implemented |
IC0123 # 02 Y:2006 | 02 | 2006 | ADJUST BURNERS FOR EFFICIENT OPERATION | $76,409 | $252,000 | Implemented |
IC0123 # 01 Y:2006 | 01 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,641,138 | $12,550,416 | Implemented |
IC0120 # 07 Y:2006 | 07 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $12,533 | $18,187 | Implemented |
IC0120 # 06 Y:2006 | 06 | 2006 | INSTALL OCCUPANCY SENSORS | $586 | $639 | Not Implemented |
IC0120 # 08 Y:2006 | 08 | 2006 | INCREASE AMOUNT OF CONDENSATE RETURNED | $29,735 | $76,800 | Not Implemented |
IC0120 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $447 | $911 | Implemented |
IC0120 # 09 Y:2006 | 09 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $114,144 | $385,200 | Implemented |
IC0120 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,943 | $1,300 | Implemented |
IC0120 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,452 | $8,047 | Implemented |
IC0120 # 02 Y:2006 | 02 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $916 | $0 | Implemented |
IC0120 # 01 Y:2006 | 01 | 2006 | RECOVER AND REUSE SPENT ACID BATHS | $132,386 | $176,160 | Implemented |
IC0120 # 10 Y:2006 | 10 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $991 | $7,638 | Not Implemented |
IC0120 # 11 Y:2006 | 11 | 2006 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $71,667 | $6,720 | Implemented |
WV0347 # 03 Y:2006 | 03 | 2006 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $11,796 | $1,000 | Implemented |
WV0347 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $32,512 | $24,300 | Not Implemented |
WV0347 # 05 Y:2006 | 05 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $10,012 | $13,815 | Not Implemented |
WV0347 # 11 Y:2006 | 11 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $457 | $158 | Not Implemented |
WV0347 # 01 Y:2006 | 01 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $255,013 | $57,159 | Implemented |