IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

81

matching recommendations
Reset
SIC 331 Blast Furnace And Basic Steel Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0113 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,620 $180 Not Implemented
UU0113 # 04 Y:2006 04 2006 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $87,860 $500,000 Not Implemented
UU0113 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $173,190 $46,250 Not Implemented
UU0113 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,530 $20,000 Not Implemented
IC0123 # 05 Y:2006 05 2006 TREAT AND REUSE RINSE WATERS $92,357 $31,583 Not Implemented
IC0123 # 04 Y:2006 04 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $861,835 $1,928,400 Not Implemented
IC0123 # 03 Y:2006 03 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,509,727 $6,804,600 Not Implemented
IC0123 # 02 Y:2006 02 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $76,409 $252,000 Implemented
IC0123 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $2,641,138 $12,550,416 Implemented
IC0120 # 07 Y:2006 07 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,533 $18,187 Implemented
IC0120 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $586 $639 Not Implemented
IC0120 # 08 Y:2006 08 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $29,735 $76,800 Not Implemented
IC0120 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $447 $911 Implemented
IC0120 # 09 Y:2006 09 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $114,144 $385,200 Implemented
IC0120 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,943 $1,300 Implemented
IC0120 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,452 $8,047 Implemented
IC0120 # 02 Y:2006 02 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $916 $0 Implemented
IC0120 # 01 Y:2006 01 2006 RECOVER AND REUSE SPENT ACID BATHS $132,386 $176,160 Implemented
IC0120 # 10 Y:2006 10 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $991 $7,638 Not Implemented
IC0120 # 11 Y:2006 11 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $71,667 $6,720 Implemented
WV0347 # 03 Y:2006 03 2006 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $11,796 $1,000 Implemented
WV0347 # 02 Y:2006 02 2006 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $32,512 $24,300 Not Implemented
WV0347 # 05 Y:2006 05 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $10,012 $13,815 Not Implemented
WV0347 # 11 Y:2006 11 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $457 $158 Not Implemented
WV0347 # 01 Y:2006 01 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $255,013 $57,159 Implemented