Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
32
matching recommendationsSIC | 331 | Blast Furnace And Basic Steel Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0763 # 09 Y:2018 | 09 | 2018 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,640 | $7,720 | Implemented |
AM0763 # 08 Y:2018 | 08 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,600 | $37,900 | Implemented |
AM0763 # 07 Y:2018 | 07 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $38,500 | $400 | Not Implemented |
AM0763 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,730 | $42,230 | Implemented |
AM0763 # 05 Y:2018 | 05 | 2018 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $45,525 | $8,000 | Not Implemented |
AM0763 # 01 Y:2018 | 01 | 2018 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $327,000 | $0 | Not Implemented |
AM0763 # 02 Y:2018 | 02 | 2018 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $515,700 | $2,200,000 | Not Implemented |
AM0763 # 03 Y:2018 | 03 | 2018 | OPTIMIZE PLANT POWER FACTOR | $105,400 | $136,400 | Implemented |
AM0763 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $98,130 | $20,000 | Implemented |
SU0466 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,439 | $44,602 | Implemented |
SU0466 # 05 Y:2018 | 05 | 2018 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $111 | $217 | Not Implemented |
SU0466 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $586 | $876 | Implemented |
SU0466 # 03 Y:2018 | 03 | 2018 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $166,039 | $203,490 | Not Implemented |
SU0466 # 02 Y:2018 | 02 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,326 | $2,058 | Implemented |
SU0466 # 01 Y:2018 | 01 | 2018 | ELIMINATE/REDUCE AN OPERATION | $9,225 | $1,173 | Not Implemented |
UD0990 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,680 | $4,200 | Not Implemented |
UD0990 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $574 | $1,000 | Not Implemented |
UD0990 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,379 | $200,263 | Not Implemented |
UD0990 # 03 Y:2018 | 03 | 2018 | OPTIMIZE PLANT POWER FACTOR | $72,351 | $48,000 | Not Implemented |
UD0990 # 05 Y:2018 | 05 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $2,774 | $10,470 | Not Implemented |
UD0990 # 04 Y:2018 | 04 | 2018 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $7,458 | $400 | Not Implemented |
UK1801 # 08 Y:2018 | 08 | 2018 | INSULATE BARE EQUIPMENT | $3,719 | $1,526 | Not Implemented |
UK1801 # 06 Y:2018 | 06 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $860 | $1,250 | Implemented |
UK1801 # 05 Y:2018 | 05 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,263 | $2,190 | Implemented |
UK1801 # 03 Y:2018 | 03 | 2018 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $26,076 | $3,990 | Not Implemented |