Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
196
matching recommendationsSIC | 3312 | Blast Furnaces And Steel Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0644 # 09 Y:2013 | 09 | 2013 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $390 | $525 | Implemented |
AM0644 # 01 Y:2013 | 01 | 2013 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $211,550 | $5,000 | Implemented |
AM0644 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $51,450 | $2,000 | Implemented |
AM0644 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $29,120 | $50 | Implemented |
AM0644 # 04 Y:2013 | 04 | 2013 | OPTIMIZE PLANT POWER FACTOR | $43,700 | $147,000 | Implemented |
AM0636 # 01 Y:2013 | 01 | 2013 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $12,500 | $5,000 | Implemented |
AM0636 # 07 Y:2013 | 07 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,005 | $13 | Implemented |
AM0636 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,600 | $900 | Implemented |
LE0331 # 08 Y:2012 | 08 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,005 | $1,000 | Implemented |
LE0331 # 04 Y:2012 | 04 | 2012 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $24,579 | $0 | Implemented |
LE0331 # 05 Y:2012 | 05 | 2012 | REDESIGN PROCESS | $20,100 | $0 | Implemented |
LE0331 # 07 Y:2012 | 07 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,134 | $2,500 | Implemented |
UA0064 # 01 Y:2011 | 01 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $35,684 | $5,000 | Implemented |
UA0064 # 03 Y:2011 | 03 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,660 | $800 | Implemented |
UD0817 # 09 Y:2010 | 09 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,120 | $0 | Implemented |
UD0817 # 11 Y:2010 | 11 | 2010 | USE OPTIMUM TEMPERATURE | $8,137 | $0 | Implemented |
UD0817 # 12 Y:2010 | 12 | 2010 | COVER OPEN TANKS | $10,386 | $0 | Implemented |
UD0817 # 13 Y:2010 | 13 | 2010 | INSULATE BARE EQUIPMENT | $21,893 | $0 | Implemented |
UD0817 # 15 Y:2010 | 15 | 2010 | INSULATE BARE EQUIPMENT | $3,996 | $0 | Implemented |
UD0817 # 01 Y:2010 | 01 | 2010 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $66,672 | $600 | Implemented |
UD0817 # 07 Y:2010 | 07 | 2010 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $628 | $0 | Implemented |
UM0365 # 05 Y:2010 | 05 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $43,773 | $13,000 | Implemented |
UM0365 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,536 | $77,254 | Implemented |
UM0365 # 02 Y:2010 | 02 | 2010 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $15,991 | $107,000 | Implemented |
UM0365 # 06 Y:2010 | 06 | 2010 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,455 | $3,500 | Implemented |