IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

193

matching recommendations
Reset
SIC 3312 Blast Furnaces And Steel Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0644 # 08 Y:2013 08 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,190 $0 Implemented
AM0644 # 09 Y:2013 09 2013 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $390 $525 Implemented
AM0636 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,600 $900 Implemented
AM0636 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,005 $13 Implemented
AM0636 # 01 Y:2013 01 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $12,500 $5,000 Implemented
LE0331 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,005 $1,000 Implemented
LE0331 # 07 Y:2012 07 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,134 $2,500 Implemented
LE0331 # 05 Y:2012 05 2012 REDESIGN PROCESS $20,100 $0 Implemented
LE0331 # 04 Y:2012 04 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $24,579 $0 Implemented
UA0064 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $35,684 $5,000 Implemented
UA0064 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,660 $800 Implemented
UD0817 # 09 Y:2010 09 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,120 $0 Implemented
UD0817 # 15 Y:2010 15 2010 INSULATE BARE EQUIPMENT $3,996 $0 Implemented
UD0817 # 13 Y:2010 13 2010 INSULATE BARE EQUIPMENT $21,893 $0 Implemented
UD0817 # 12 Y:2010 12 2010 COVER OPEN TANKS $10,386 $0 Implemented
UD0817 # 11 Y:2010 11 2010 USE OPTIMUM TEMPERATURE $8,137 $0 Implemented
UD0817 # 01 Y:2010 01 2010 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $66,672 $600 Implemented
UD0817 # 07 Y:2010 07 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $628 $0 Implemented
UM0365 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,536 $77,254 Implemented
UM0365 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $1,051 $0 Implemented
UM0365 # 07 Y:2010 07 2010 USE OPTIMUM THICKNESS INSULATION $1,040 $22,500 Implemented
UM0365 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $43,773 $13,000 Implemented
UM0365 # 06 Y:2010 06 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,455 $3,500 Implemented
UM0365 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,966 $13,000 Implemented
UM0365 # 02 Y:2010 02 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $15,991 $107,000 Implemented