IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

561

matching recommendations
Reset
SIC 3312 Blast Furnaces And Steel Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DS0092 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $134 $182 Implemented
DS0092 # 04 Y:1997 04 1997 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,905 $2,100 Not Implemented
DS0092 # 05 Y:1997 05 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $2,123 $700 Not Implemented
DS0092 # 06 Y:1997 06 1997 USE A RAG RECYCLE SERVICE $227 $750 Not Implemented
DS0092 # 07 Y:1997 07 1997 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $12,302 $5,500 Implemented
DS0092 # 08 Y:1997 08 1997 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,893 $360 Implemented
DS0093 # 01 Y:1997 01 1997 OPTIMIZE PLANT POWER FACTOR $802 $1,500 Implemented
DS0093 # 02 Y:1997 02 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $431 $24 Implemented
DS0093 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $250 $500 Not Implemented
DS0093 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $308 $76 Implemented
DS0093 # 05 Y:1997 05 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $851 $4,500 Not Implemented
DS0093 # 06 Y:1997 06 1997 AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK $37,008 $11,176 Implemented
DS0093 # 07 Y:1997 07 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $4,020 $1,016 Implemented
WI0266 # 01 Y:1996 01 1996 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $6,680 $2,500 Not Implemented
WI0266 # 02 Y:1996 02 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,481 $30,000 Not Implemented
WI0266 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,572 $1,280 Implemented
WI0266 # 04 Y:1996 04 1996 RECOVER WASTE HEAT FROM EQUIPMENT $899 $600 Not Implemented
WI0266 # 05 Y:1996 05 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,072 $1,800 Implemented
WI0266 # 06 Y:1996 06 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $150 $250 Implemented
WI0266 # 07 Y:1996 07 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,546 $1,220 Implemented
WI0266 # 08 Y:1996 08 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $440 $0 Implemented
WV0057 # 01 Y:1995 01 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $694 $0 Not Implemented
WV0057 # 02 Y:1995 02 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $38,326 $36,000 Not Implemented
WV0057 # 03 Y:1995 03 1995 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $4,127 $19 Not Implemented
WV0057 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,409 $0 Not Implemented