IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 3312 Blast Furnaces And Steel Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0322 # 06 Y:2025 06 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $415 $1,570 n/a
TT0322 # 05 Y:2025 05 2025 USE SOLAR HEAT FOR HEAT $40,764 $113,963 n/a
TT0322 # 04 Y:2025 04 2025 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION $7,760 $15,000 n/a
TT0322 # 03 Y:2025 03 2025 INSTALL OCCUPANCY SENSORS $583 $875 n/a
TT0322 # 02 Y:2025 02 2025 OPTIMIZE PLANT POWER FACTOR $16,071 $15,000 n/a
TT0322 # 01 Y:2025 01 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $473 $60 n/a
TT0142 # 05 Y:2014 05 2014 DISCONNECT BALLASTS $555 $60 Not Implemented
TT0142 # 01 Y:2014 01 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,305 $1,400 Implemented
TT0142 # 02 Y:2014 02 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $299 $596 Not Implemented
TT0142 # 03 Y:2014 03 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $861 $1,662 Not Implemented
TT0142 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,651 $3,000 Implemented
TT0142 # 06 Y:2014 06 2014 USE PHOTOCELL CONTROLS $49 $45 Implemented
TN0681 # 02 Y:2000 02 2000 MODIFY CURRENT INCENTIVE PROGRAM $20,000 $16,083 Implemented
TN0681 # 06 Y:2000 06 2000 COVER OPEN TANKS $2,400 $1,700 Not Implemented
TN0681 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $3,865 $9,000 Not Implemented
TN0681 # 04 Y:2000 04 2000 DISCONNECT BALLASTS $6,170 $250 Not Implemented
TN0681 # 03 Y:2000 03 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $11,200 $23,000 Implemented
TN0681 # 01 Y:2000 01 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $32,683 $83,500 Implemented
TN0637 # 01 Y:1998 01 1998 REDUCE SCRAP PRODUCTION $386,750 $427,700 Not Implemented
TN0637 # 02 Y:1998 02 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $248,625 $0 Implemented
TN0637 # 03 Y:1998 03 1998 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $48,770 $9,300 Implemented
TN0637 # 04 Y:1998 04 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $38,400 $21,000 Not Implemented
TN0637 # 05 Y:1998 05 1998 BURN A LESS EXPENSIVE GRADE OF FUEL $14,970 $16,200 Not Implemented
TN0637 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,860 $1,000 Implemented
TN0637 # 07 Y:1998 07 1998 RECYCLE NONFERROUS DUST $2,880 $0 Implemented