IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

661

matching recommendations
Reset
SIC 3315 Steel Wire And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0163 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,841 $1,621 Not Implemented
AR0163 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,383 $120 Not Implemented
AR0163 # 03 Y:1999 03 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $226 $2,400 Not Implemented
AR0163 # 04 Y:1999 04 1999 USE OPTIMUM THICKNESS INSULATION $11,267 $1,408 Not Implemented
AR0163 # 05 Y:1999 05 1999 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $251,669 $66,400 Not Implemented
AR0163 # 06 Y:1999 06 1999 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $3,065 $225 Not Implemented
AR0146 # 01 Y:1998 01 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,771 $840 Implemented
AR0146 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,850 $300 Implemented
AR0146 # 03 Y:1998 03 1998 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $29,234 $18,900 Implemented
AR0146 # 04 Y:1998 04 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,398 $1,340 Implemented
AR0146 # 05 Y:1998 05 1998 REDUCE OR ELIMINATE WASTE $224,855 $8,100 Implemented
AR0146 # 06 Y:1998 06 1998 REPROCESS SPENT OILS ON SITE FOR RE-USE $17,264 $0 Not Implemented
AR0146 # 07 Y:1998 07 1998 PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW $3,780 $0 Implemented
AR0146 # 08 Y:1998 08 1998 INSTALL AUTOMATIC PACKING EQUIPMENT $98,162 $386,400 Implemented
UD0554 # 01 Y:1998 01 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $101,400 $60,000 Not Implemented
UD0554 # 02 Y:1998 02 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $47,736 $2,000 Not Implemented
UD0554 # 03 Y:1998 03 1998 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $28,560 $8,000 Implemented
UD0554 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $19,707 $21,120 Not Implemented
UD0554 # 05 Y:1998 05 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $4,026 $1,850 Implemented
UD0554 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,699 $6,419 Not Implemented
UD0554 # 07 Y:1998 07 1998 COVER OPEN TANKS $2,023 $1,050 Implemented
NC0140 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $489 $852 Implemented
NC0140 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $4,227 $1,090 Implemented
NC0140 # 03 Y:1998 03 1998 COVER OPEN TANKS $5,237 $10,500 Not Implemented
NC0140 # 04 Y:1998 04 1998 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,006 $6,000 Not Implemented