Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
22
matching recommendationsSIC | 3317 | Steel Pipe And Tubes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0850 # 09 Y:2013 | 09 | 2013 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $434 | $2,080 | Implemented |
OK0850 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $906 | $337 | Implemented |
OK0813 # 11 Y:2011 | 11 | 2011 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $8,447 | $25,472 | Implemented |
OK0813 # 09 Y:2011 | 09 | 2011 | INSULATE BARE EQUIPMENT | $1,037 | $190 | Implemented |
OK0813 # 08 Y:2011 | 08 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,672 | $990 | Implemented |
OK0813 # 07 Y:2011 | 07 | 2011 | OPTIMIZE PLANT POWER FACTOR | $19,954 | $13,110 | Implemented |
OK0813 # 06 Y:2011 | 06 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,231 | $64,515 | Implemented |
OK0813 # 05 Y:2011 | 05 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,469 | $7,737 | Implemented |
OK0813 # 02 Y:2011 | 02 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $52,531 | $65,527 | Implemented |
OK0589 # 04 Y:2000 | 04 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $72,000 | $230,000 | Implemented |
OK0589 # 05 Y:2000 | 05 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $20,274 | $59,400 | Implemented |
OK0589 # 03 Y:2000 | 03 | 2000 | USE PHOTOCELL CONTROLS | $504 | $136 | Implemented |
OK0589 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,093 | $4,942 | Implemented |
OK0589 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,862 | $1,900 | Implemented |
OK0387 # 09 Y:1992 | 09 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7 | $111 | Implemented |
OK0387 # 05 Y:1992 | 05 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $832 | $0 | Implemented |
OK0387 # 04 Y:1992 | 04 | 1992 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,087 | $1,276 | Implemented |
OK0387 # 03 Y:1992 | 03 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,457 | $1,131 | Implemented |
OK0387 # 01 Y:1992 | 01 | 1992 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $20,408 | $1,580 | Implemented |
OK0274 # 01 Y:1989 | 01 | 1989 | INSTALL TIMERS AND/OR THERMOSTATS | $544 | $350 | Implemented |
OK0274 # 06 Y:1989 | 06 | 1989 | UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS | $2,113 | $1,925 | Implemented |
OK0274 # 03 Y:1989 | 03 | 1989 | INSULATE BARE EQUIPMENT | $23,241 | $3,556 | Implemented |